Loading...
Northlake 635(2)-LR 970331TECHNOLOGIES INC CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: SERVICES: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX REPORT OF IN-PLACE DENSITY Ma) 2,, PAGE 1 oF PROJECT NO;: 090~ REPORT NO.: 1140 DATE OF SERVICE: AUTHORIZATION: Ch REPORT DATE: 3/ Perform in-place density and moisture content tests to d of field compaction. CONTRACTOR: BUTLER CONSTRUCTION METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION: DENSITY: 92% DRY DENSITY MOISTURE: +4 to +7% opt moist TEST OF: Onsite Material PROJECT DATA MATERIALS 109289-Dark and light brown clay M REPORT OF TESTS FIELO OPTIMUM FIELD TEST MOISTURE MOISTURE WET( NO LOCATION Building A subgrade retest 40' south and 80' east of northwest building corner. Building A subgrade retest 40' south and 40' east of northwest building corner 29.9 24.0 109. 29.4 24.0 108., Test results on this report meet project specifications as noted above. CRT Started: 04:00PM Stopped: 05:00PM im Tach.. Southwestem Labs ;75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 77 3/19/97 mrlie 31/97 Technician: Jay Canafax, Report Distribution: -=termine the degree 01STURE/DENSITY RELATIONS MAXIMUM DENSITY pcf 93.5 MAXIMUM DENSITY DENSITY (Pcf) (% max) 93.5 93 93.5 92 O :TIMUM M 01STURE % 24.0 DENSITY ~cf) DRY 87.1 86.2 (1) Lincoln Pro~rw Co, MAXIM TE( (1) BUTLER CONSTRUCTION 'NCORP. (1) 8ROCKETT-DAVIS-ORAKE. INC. (1) THE Cl'r'Y OF COPPELL //~~ {1) THE CI~-Y OF COPPELL (1) O'BRIEN ASSOCIATES,INC. (1) A.E.C.C. Our letters and reports are for the exclusive use of :he client to whom they are e~dressed and snail full w~hout the approval of the testi~ laboratory. The use of our mama must receive our written &OpCovsl. Out, 007 LW apply only ~o the sample ~ested a~/or imspected, a~ are no~ ~ica[Ive of the ~uanti¢ies of ap0erently identical or '!. ·SOU~S ~i-~t~ken, B. S. Ch. E. 'eject Manager :ed except in similsr products.