Northlake 635(2)-LR 970331TECHNOLOGIES INC
CLIENT:
Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
SERVICES:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
REPORT OF
IN-PLACE DENSITY
Ma)
2,,
PAGE 1 oF
PROJECT NO;: 090~
REPORT NO.: 1140
DATE OF SERVICE:
AUTHORIZATION: Ch
REPORT DATE: 3/
Perform in-place density and moisture content tests to d
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION:
DENSITY: 92% DRY DENSITY
MOISTURE: +4 to +7% opt moist
TEST OF: Onsite Material
PROJECT DATA
MATERIALS
109289-Dark and light brown
clay
M
REPORT OF TESTS
FIELO OPTIMUM FIELD
TEST MOISTURE MOISTURE WET(
NO LOCATION
Building A subgrade retest
40' south and 80' east of
northwest building corner.
Building A subgrade retest
40' south and 40' east of
northwest building corner
29.9 24.0 109.
29.4 24.0 108.,
Test results on this report meet project
specifications as noted above.
CRT Started: 04:00PM Stopped: 05:00PM
im Tach.. Southwestem Labs
;75 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
605034
77
3/19/97
mrlie
31/97
Technician: Jay Canafax,
Report Distribution:
-=termine the degree
01STURE/DENSITY RELATIONS
MAXIMUM
DENSITY pcf
93.5
MAXIMUM
DENSITY DENSITY
(Pcf) (% max)
93.5 93
93.5 92
O :TIMUM
M 01STURE %
24.0
DENSITY
~cf)
DRY
87.1
86.2
(1) Lincoln Pro~rw Co, MAXIM
TE(
(1) BUTLER CONSTRUCTION 'NCORP.
(1) 8ROCKETT-DAVIS-ORAKE. INC.
(1) THE Cl'r'Y OF COPPELL //~~
{1) THE CI~-Y OF COPPELL
(1) O'BRIEN ASSOCIATES,INC.
(1) A.E.C.C.
Our letters and reports are for the exclusive use of :he client to whom they are e~dressed and snail
full w~hout the approval of the testi~ laboratory. The use of our mama must receive our written &OpCovsl. Out,
007 LW apply only ~o the sample ~ested a~/or imspected, a~ are no~ ~ica[Ive of the ~uanti¢ies of ap0erently identical or
'!. ·SOU~S
~i-~t~ken, B. S. Ch. E.
'eject Manager
:ed except in
similsr products.