Northlake 635(2)-LR 970331 (2)TECHNOLOGIES INC
CLIENT:
Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
Ma)
2,~
REPORT OF
IN-PLACE DENSITY
PAGE 1 OF 2
PROJECTNO~: 090;
REPORT NO.: 1140
DATE OF SEKVICE:
AUTHORIZA'EION: Ch
REPORT DATE: 3 /
im Tech.· Southwestern Labs
;75 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: {214) 631-2700
FAX: (214) 920-1891
605034
71
3/19/97
~rlie
31/97
SERVICES: Perform in-place density and moisture content tests to d
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION:
DENSITY: 95% DRY DENSITY
MOISTURE: 0 to +3% opt moist
TEST OF: Select fill
TEST
NO LOCATION
· C 0 7 LW
Building Pad "A"
50' north and 120' east of
southwest corner, first lift
Building Pad "A" 50' north
and 60' east of southwest
corner, first lift
Building Pad "A"
100' north and 60' east of
southwest corner, first lift
PROJECT DATA
MATERIALS
l12122-Reddish Brown Clayey
Sand
REPORT OF TESTS
~termine the degree
OISTURE/DENSITY RELATIONS
)TIMUM MAXIMUM
OISTURE % DENSITY pcf
13.5 115.0
FIELD OPTIMUM FIELn
MOISTURE MOISTURE
(%) (%) WET(
15.0 13.5 127.
15.3 13.5 128.
15.7 13.5 128.
DENSITY MAXIMUM
3cf) DENSITY DENSITY
DRY (Pcf) (% max)
109.3 115.0 95
110.2 115.0 96
109.8 115.0 95
Report Of Tests Continued On Page 2
Our letters and reports are for the exclusive use of the chant to ,vnom t;ney are addressed and snail not be reprodu
full without t~e approval ~f t~ [esling laDoratory. The use cf our name must receive our written approval. Our ~{
TEST
NO
Lincoln Property Co.
PROJECT NO. 0903605034
DATE OFSERVICE: 3/19/97
REPORT OF TESTS (Continued)
LOCATION
Building Pa d "A" 100' north
120' east of southwest corner
first lift
Building Pad "A"
150' north and 120' east
of southwest corner, first
lift
FIELD OPTIMUM FIELr
MOISTURE MOISTURE
(%) (%) , WET
14.0 13.5 131.
15.5
13.5 128.
Building Pad "A"
150' north, 60' east of south
west corner, first lift
13.7 13.5 130.
Test results on this report meet project
specifications as noted on page 1.
Technician: Jay Canafax, CET Started: 05:00PM Stopped: 06:30PM
Report Distribution:
{1 ) Lincoln Property Co.
(1) BUTLER CONSTRUCTION INCORP.
(1) 8ROCKETT-DAVIS-DRAKE,INC.
(1) THE CITY OF COP~PELL
(1) THE CITY OF COPPELL
(1) O'SRIEN ASSOCIATES, [NC.
(1) A.E.C.C.
~007 .W
MAXIM TEC
Our letters an~ reports are for t,~,e exclusive use of the client to wt~om t~¥ are a¢ldressed and smell nec De reprodu,
Cull wItt~out tbs a0provat of tree :eating Jaboratory. ,-he use of cur name must receive our written approval. Our !s
REPORT NO. 114071
PAGE 2 OF 2
DENSITY MAXIMUM
)cf) DENSITY DENSITY
DRY (Pcf) {% max)
113.4 115.0 99
110.1 115.0 96
112.6 115.0 98
LABS
~cken, B.a. Ch.E.
oj oct Manager
ed except in
tars em~i reports
imiiar r~r oducts,