Loading...
Northlake 635(2)-LR 970331 (3)Max 2.= TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF STRUCTURAL STEEL INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LA/~RY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PAGE 1 OF 1 PROJECT NO.: 090.3 REPORT NO.: 1140~ DATE OF SERVICE: ~ AUTHORIZATION: Chi REPORT DATE: 3/~ Perform Structural Steel Inspection. REPORT OF INSPECTION Drawings Utilized: Locations/Items Inspected: *Discrepancies/Comments: 1. Structural Building "B" The precast wall panels have been erected with the exc~ allow entry. The wall panel eh%bed plate connections are being welde¢ this time. The columns and roof joists have been erected, the joi~ been installed and is being fastened to wall panels. We found that a number of joist girder seats had not bG wall pocket embeds and the locations were marked with later reinspection. Technician Time: 5 hours Technician: Godfrey Macias C.W.I. Report Distribution: {1} Lincoln Pro~er~, Co. (1) BUTLER CONSTRUCTION INCORP. {1! BROCKETT-DAVIS-ORAKE.iNC. {1l THE CIT~ OF COPPELL (II THE CITY OF COPPELL (li O'BRIEN ASSOCIATES, INC. {1} A.E.C.C. ~C99 JS MAXIM TE( im Tach. Southwestern Labs 75 Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1991 605034 ~4 3/19/97 trlie ~1/97 ~ption of'one to in place at bridging has en welded to ed crayon for oject Manager ~d exceot in