REPORT OF
STRUCTURAL STEEL INSPECTION
Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LA/~RY MOON
Dallas, TX 75201
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PAGE 1 OF 1
PROJECT NO.: 090.3
REPORT NO.: 1140~
DATE OF SERVICE: ~
AUTHORIZATION: Chi
REPORT DATE: 3/~
Perform Structural Steel Inspection.
REPORT OF INSPECTION
Drawings Utilized:
Locations/Items Inspected:
*Discrepancies/Comments:
1.
Structural
Building "B"
The precast wall panels have been erected with the exc~
allow entry.
The wall panel eh%bed plate connections are being welde¢
this time.
The columns and roof joists have been erected, the joi~
been installed and is being fastened to wall panels.
We found that a number of joist girder seats had not bG
wall pocket embeds and the locations were marked with
later reinspection.
Technician Time:
5 hours
Technician: Godfrey Macias
C.W.I.
Report Distribution:
{1} Lincoln Pro~er~, Co.
(1) BUTLER CONSTRUCTION INCORP.
{1! BROCKETT-DAVIS-ORAKE.iNC.
{1l THE CIT~ OF COPPELL
(II THE CITY OF COPPELL
(li O'BRIEN ASSOCIATES, INC.
{1} A.E.C.C.
~C99 JS
MAXIM TE(
im Tach. Southwestern Labs
75 Lone Star Dr. P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1991
605034
~4
3/19/97
trlie
~1/97
~ption of'one to
in place at
bridging has
en welded to
ed crayon for
oject Manager
~d exceot in