Loading...
Northlake 635(2)-LR 970328 (2)TECHNOLOGIES INC Maxil 257 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT NO.: 0903~ REPORT NO.: 11419 COPPELL BUSINESS CENTER DATE OF SERVICE: 3 WRANGLER DR. & BELTLINE RD. AUTHORIZATION: Cha COPPELL, TX REPORT DATE: 3/2 PAGE 1 OF 3 Test compressive strength specimens prepared in conjuncti. inspection. PROJECT DATA CONTRACTOR: BUT'r.ER CONSTRUCTION MIX DESIGN NUMBER: 9339 CONCRETE SUPPLIER: PIONEER CLASS OF CONCRETE: 3000 PLANT: 22 DATE OF PLACEMENT: 3/2 SPECIFICATION REQUIREMENTS TIME SAMPLED: 05: 00 STRENGTH: 3000psi @ 28 DAYS TEMPERATURE (DegF) - AIR: 5; SLUMP: 5" AIR: 3-6% TRUCK NO: 728 METHOD OF TEST MEASURED SLUMP (in.): 5.5 SAMPLING: ASTM C-172 AIR CONTENT(%): 3.25 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 LOCATION OF PLACEMENT: TEMPERATURE: ASTM C1064 170' From expansion AIR CONTENT: ASTM C173 building A. 6' from UNIT WEIGHT: CAPPING/PADS: ASTM C617 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH- 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) Isq.in.) (lbs. force) (psi) FR 7 6.00 28.27 99880 3530 CO 7 6.00 28.27 96080 3400 COl CYLINDER MARKED DATE SET NO. TESTED 3/28/97 3/28/97 4/l~/97 28 1 4 4/18/97 28 Technician: David King Technician Report Of Tests Continued On Page 2 n Tech.· Southwestern Labs 5 Lone Star Dr. · P.O. Box 224227 Dallas. Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 05034 ? /21/97 ~l£e 3/97 )n with concrete psi @ 28 days ~/97 BY: David King CONCRETE: 70 TICKET NO: 343186 oint at west end of orth curb. ~,CTU RE TYPE REMARKS 4E 4E 1OO1 FR Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/21/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C173 UNIT WEIGHT: CAPPING/PADS: ASTM C617 TESTING: ASTM C39 DAYS AIR: 3-6% CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 9339 CLASS OF CONCRETE: 3000 DATE OF PLACEMENT: 3/2; TIME SAMPLED: 06:25 TEMPERATURE (DegF) - AIR: 5~ TRUCK NO: 551 MEASURED SLUMP {in.): 6.0( AIR CONTENT(%): 4.0 LOCATION OF PLACEMENT: 10'From west expansi¢ building A, 4' from REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.} (sq.in.) (lbs. force} (psi) FR~ 2 1 3/28/97 2 2 3/28/97 2 3 4/18/97 7 6.00 28.27 87540 3100 CO5 7 6.00 28.27 78970 2790 CO5 28 2 4 4/18/97 28 Technician: David King Technician Report Of Tests Continued On Page 3 REPORT NO. 114197 PAGE 2 OF 3 SET NO. 2 psi @ 28 days ,/97 BY: David King CONCRETE: 70 TICKET NO: 343197 n joint at end of north curb. CTURE TYPE REMARKS Our !attars ar~ reports are for tt~e exclusive Lee of the client to whom they are addressed ~d shall not ~ reor~uc~ except in ~uil wltho~ t~ aDprovei of t~ t~ti~ leDoratory. T~ ~ of o~ name m~t receive o~ written approval. Our lette~ I a~ reports Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/21/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 SLUMP: .5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C173 UNIT WEIGHT: CAPPING/PADS: ASTM C617 TESTING: ASTM C39 DAYS AIR: 3-6% CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 9339 CLASS OF CONCRETE: 3000 DATE OF PLACEMENT: 3/2 TIME SAMPLED: 08:30 TEMPERATURE (DegF) - AIR: 7 TRUCK NO: 739 MEASURED SLUMP (in.): 6.5 AIR CONTENT(%): 4.25 LOCATION OF PLACEMENT: 110' From east curb REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) (in.) {sq.in,) {lbs. force) (psi) FR 3 I 3/28/97 3 2 3/28/97 3 3 4/18/97 7 6.00 28.27 90790 3210 CO 7 6.00 28.27 96160 3400 28 3 4 4/18/97 28 Technician: David King Technician Report Distribution: {1 ! Lincoln Pro~erW Co. ~/1~ {1) BUTLER CONSTRUCTION ,NCORP. (11 THE CITY OF COPPELL (1) THE CITY OF COPPELL {1) O'BRIEN ASSOCIATES. INC. (1) A.E.C.C. Our let~e*e and reports are for the exclusive use of the client to whom they are addressed and ~1 not be roprocluc~ REPORT NO. 114197 PAGE 3 OF 3 SET NO. 3 psi @ 28 days 1/97 BY: David King CONCRETE: 70 TICKET NO: 343210 2' from north curb. %CTURE TYPE REMARKS ~E RN LABS ~racken, B.S. Ch.E. ~ject Manager I except in