Northlake 635(6)-CS 951130ITEM:
DRC DATE:
CONTA CT:
COMMENT STATUS:
DEVELOPMENT REVIEW COMMI
ENGINEERING COMMENTS
the development of a 235, 000 square foot warelmuse/f~
a $2.8 acres site, located at the northwest corner of 1~
Lakeshore DrDe, at the request of Fults Associates, In
November 30, 1995 & December 7, 1995
Ken Griffin, P.E., Assistant City Manager/City Engit
/PRELIMINARY FINAL
~m_ Hat. to allow
wtory building on
;lt Line Road and
:eer (304-3679)
Preliminary Plat
1. This property was originally platted in 1985 as North Lake 635 Busines
be a replat not a preliminary plat. The replat will get through the proc¢
affect the requirement for the payment of roadway impact fees.
2. Show fire lane easements.
3. Show zoning of adjacent properties.
4. Provide sanitary sewer easements for 8" sanitary sewer line entering
north side of the property.
5. Show actual limits of the easemems not just the center lines.
6. The original plat showed a GTE easemem (Volume 70182, Page 0322
easement. If it has been abandoned, then the volume and page of the
be shown on the plat.
7. There needs to be a note on the face of the plat specifying the
maintenance of the channel on the north side of the site.
8. The proposed storm drainage could be in the GTE or TP&L easement.
easements to those utilities, then you will not be able to install a ston
without the consent of either GTE or TP&L. This should be clarified
Site Plan
1. Show location of hike and bike trail.
2. Provide information regarding how the drainage ditch on the east side
3. Show the medians on Belt Line Road.
4. Brick paver bands will need to be provided for all driveways intersectiJ
per the City's Streetscape Plan.
5. Provide details for proposed left turn lane on Belt Line Road. Need 10(
of storage.
Park. This should
ss quicker and could
the manhole on the
) west of the TP&L
abandonment should
esponsibility of the
If they are exclusive
n drain within them
will be addressed.
~g Belt Line Road as
I' transition and 100'