Loading...
Northlake 635(6)-CS 951013The Fults Companies/ON~i~lnternat~onal 300 Crescent Court, 12ff '~r DalLas, Texas 75201 Office: 214/871-6666 Fax: 214/871-6656 Bruce R. Vice Presi Director FULTSASSOCIATES VIA FAX October 13, 1995 Mr. Ken Griffin, City Engineer City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Dear Mr. GritTm: We are pleased to understand that your preliminary review of the intex Drive and Beltline Road appears to warrant the installation of a traffic completion of the referenced project. Per your request, we have con information in order that you may proceed with the next step of yo addition, we have contacted Haverty's (potential purchase of the tract as the potential buyer of the 7 acre tract at the southwest comer o: Lakeshore Drive and asked them to provide similar information in complete an overall comprehensive study of this intersection. Our responses below correspond to the numbered requests in your fax The initial facility for this project will be approximately consideration is being given to allow overall expansion o 500,000 - 600,000 s.f. The uses in the initial facility br~ Office Area Assembly/distribution warehouse area Training area TOTAL 5 15 21 The buildings will be located such to allow future expanl initial construction is anticipated to proceed from the no site with major frontage along Beltline Road. Entrance f is anticipated to be fully offofLakeshore Drive with onl, management parking entering from Beltline Road. Heller Jent Project Services ~ction at Lakeshore fignal following the filed the following r traffic study. In :o the south) as well Beltline Road and >rder that you may transmission. 220,000 s.f. Design n the site to between ak down as follows: 2,000 s.f. 5,900 s.f. ~.100 s.f. 7,000 s.f. ;ion on the site. The rtheast comer of the >r employee parking ~ visitor and selected Mr. Ken Griffin October 13, 1995 Page 2 Our client currently employs approximately 250 peol facility. Due to their aggressive growth, it is anticipate~ number will be approximately 325-350 by the time this It is difficult to predict the employee residential demogr, of time, especially with the relocation of the facility. facilities are south and east of this proposed site and anticipate the majority of traffic would come from the o The projected traffic on an hour by hour basis entering an and Beltline Road is very difficult to anticipate. G anticipate the majority oftraffc with the starting and en in your Item 7 below. We feel your traffic engineer is n to project traffic counts based on the information we ha 7 below. Deliveries to this facility vary significantly based on average, a truck count of approximately 30-40 per day 7. The normal business hours for our client's facility are We trust the above provides the information you need to move forward. any additional information or have any questions, do not hesitate to co Sincerely, THE FULTS COMPANIES ONCO~R, Jjalemational BRH:kks cAful~',,~oj i~c~\95013 p~rifno 12.1tr CCi Morris Orr Cyril Kasmir David Dillard de at their present I that the employee facility opens. phics over a period )ur client's current ye would therefore >utherly direction. d exiting Lakeshore ~nerally we would :ling times as noted tuch more qualified ~e provided in Item ~ork activities. On anticipated. 00 a.m - 6:00 p.m. Should you require atact me.