Loading...
Northlake 635(6)-CS 951011FULTSASSOCIATES 'vIA October 11, 1995 Honorable Tom Morton Mayor, City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 RE: The Albany ProjeCt, Coppell Site Dear Mayor: We sincerely appreciate all the cooperative effort and hard w( provided during our review process in assisting our client to fm order that a decision can be made by our client, we have summ the last several weeks to the following specific items in o~ understanding exists with you prior to our decision being ma& i Hei!er ~..'u ce R. 2'£ ~Cl 5q:", iT5 ,rk you fiize th ~zed ~ 'der to Our understanding of these discussions are as follows: Our client proposes to locate a corporate h4adqum distribution facility on the selected site. The t~tal ca project is estimated at this time to be approximately $12- land costs. Based on this level of investment andlthe understanding that our client would be a candidate for approval bom city council for an ad valorem tax ~batem 75% for a five year period. Per my discussion of 10/10/95 with Mr. Jim Witt. provided a concept plan is submitted in acc, subdivision ordinance and approved prior to therefore vested and our project would not be sul fees for the construction indicated on the conce tism danci 20/9~ ~ct to plan. and your staff have eir site selection. In ~ur discussions from ensure that a clear ters and assembly/ aital budget for this million excluding icipated use, it is our md likely to receive ..nt in the amount of understanding that, with your current our submission is he roadway impact It is our understanding that utility tap fees as i~dicate~ in the standard fee schedules provided bythe City of Coppell will lpply tI this project. Honorable Tom Martin October 11, 1995 Page 2 Per our previous conversations, we understand willing to charge building permit fees based time and plan review in lieu of the standard fee City of Coppell is costs of inspection o o We appreciate your efforts in dealing with TU faxed from TU Electric dated October 6, 1995, existing primary feeder line off of the relocation being on the east side of Beltline Based on the letter to relocate the with the likely Per my discussions with Mr. Ken Griffin Goodwin, it is our understanding that a utilized at the north property boundary will allow the required flow and maintenance is' engineer, Matt channel can be configuration by the land owner. Per my telephone conversation this morning understanding that the initial traffic study at the intersection of Beltline and Lakeshore. further detailed information being provided by traffic engineer. We understand the installation verification subsequent to this City of Coppell. Per our previous meeting, it was indicated that mCnies year 1996 to make repairs to the existing pavin~ and within Lakeshore Drive. Per a previous meeting with also understood that monies are available to exlend th serving this part of the city in order to eliminat~ any 1o in the area. Griff'm, it is my for a traffic light contingent upon :for analysis by your light following at cost to the e budgeted for fiscal .torm sewer systems /Ir. Ken Griffin, it is .~ existing water line w pressure concerns It is understood that a median cut with left mm l~.e wil~ be allowed onto our property, properly spaced from adjacent imerse~tions, tit is understood that the property owner will be responsible for the cost of this median cut. Honorable Tom Martin October 11, 1995 Page 3 3 /~1~.~ "/ Per our meeting we understand that a hike future, will be located on the expanded ri City of Coppell along Beltline Road. No owner will be required for this hike and bike trail. that, with the formal submission of a written along Lakeshore Drive will not subject to actual demand as deemed necessary Per our meeting, it is understood that the City screening requirements for any track doors indicate the exterior of the building may be It is understood that the City of Coppell whereby the land owner may utilize the landscaping improvements to be installed at maintained by the land owner. The expanded property of the City of Coppell. We trust the above are a mutual understanding of the items welhave p If this is the case, please indicate by signing in the space provi{led bel fax a copy of this letter to me. If we are not in agreement on th~above me immediately. We look forward to resolution on the abovelitems; quickly in our decision making process. ~ Sincerely, THE FULTS COMPANIES ONCOR International Bruce Heller Vice President cc: Jim Witt, City of Coppell Cyril Kasmir VIA FAXsi d :g~~c~ ./..~, Honorable ~I Mayo~City inthe owned by the from the property we understand of sidewalks only be required Engineer. will waive the Drive and an agreement right of way for owner's cost and will remain the reviously discussed. ow and returning by items, please notify md moving forward n Morton ,f Coppell