September 8, 1988 < - ·
Mr. Alan Ratliff '~
City ~nager
City of Coppell
P. O. Box 478
Coppe11, Texas 7S019
Dear Mr. Ratliff:
Attached is a letter proposal from DeShazo, Starek & Tan~ for the
constmction administration of the drainage facilities along Minyard
propert i es.
~d.s fire has provided all of the desi~ of the project and is the
most f~iliar and qualified to provide construction a&inistratkon,
shop drawing reviews, mater-tals testing reviews, and answer any
questions about the project durin~ the constn~ction phase.
We reco~end that rids contract be approved.
Sincerely,
11. Wa)me Gi~, P.E.
tgm/mj
1711)3 Ihc.,.ltm Ilo.'td · Suitt: 1011 · I.B lib; · I~alla'.,. 'l'c×a,, 7524,'-;' · Pho~c
Dallas, Texas 75202 7633 E. 63rd. Place Austin. Texas 78701
(21.1) 748-67,10 Tulsa, Oklahoma 74133 (512) 472-4214
Metro--263-5428 (918) 250-2621
o Sundance Square
120 West Third Street. Suite 210
Fort Worth, Texas 76102-7401
~817) 332-2074
LETTER OF TRANSMITTAL
WE ARE ENCLOSING:
No Copies Description
For Your Use As Requested
For Your Approval Approved as Noted
REMARKS: ,-~r,o~-.I - ~,,- t' .,,.~'i : ,,~ ~,,-' ~-,.,,,.".
COPY TO: SIGNEDC "
/ I/
D
¢Shazo. Starck & Tang. Inc.
EnL~ineers · Planners
.11.~(} 1. ilJoll Station · I)tdl:ts. 'l'rx~,~ ~.~21;2 · 214
September 7, 1988
Mr. Alan Ratliff
City Manager
City of Coppell
255 Parkway Blvd.
Coppell, Texas
Re: Bethel Road Drainage Improvements
Post Office Site to Freeport Parkway
Construction Administration
88157.04
Dear Mr. Ratliff:
In accordance with our discussions with Mr. Wayne Ginn, the City's
consultant, we have prepared this proposal for providing construc-
tion administration for construction of Bethel Road Drainage
Improvements from the Post Office Site to Freeport Parkway. Two
copies of this proposal are enclosed. We prepared the construction
plans for both this project as well as the Royal Lane Pavement from
LBJ to Bethel Road.
We propose to provide the following services:
A. Review shop drawings;
B. Review test results;
C. Review and approve contractor applications for payment;
D. Make periodic visits to the site to monitor general contract
compliance;
E. Resolve claims, disputes and other matters between the
contractor and the City;
F. Attend meetings as requested by Minyard's, the project in-
spector and City officials;
G. Provide other services as requested.
We propose to provide these services on an hourly rate basis in
accordance with the attached rate schedule provided the project is
completed within 365 days (contract time for construction is 230
days).
Mr. Alan Ratliff
September 7, 1988
Page 2
Subcontract services such as, but not limited to, materials testing
will be provided on a cost plus 10% basis. Payment for authorized
services will be due upon presentation of our monthly statements for
such services.
If this proposal meets with your approval, please execute both copies
and return one copy to us. Please call me or Clyde Sifford if you
have any questions.
We appreciate this opportunity to be of service.
Sincerely,
Paul A. Lipscomb, P.E.
Vice President
PAL/CLS/np
encl
ACCEPTED: CITY OF COPPELL
By:
Title:
Date:
CIVIL CONSULTANT'S HOURLY RATE SCHEDULE
September 1988 - September 1989
Hourly
Rate
Principal $100
Director $ 75 - 85
Project Manager $ 55 - 75
Project Engineer $ 45 - 60
Design Engineer $ 35 - 45
Technician $ 35 - 53
Draftsman $ 22 - 35
Surveyors $ 17 - 35
Secretarial $ 24 - 42