Minyard-CS 880908 _ ._~g',~r~ ~./-.</z~' ~ (;INN, IN(:. (~()NSI'i,TIN(; EN(;INEli;I{S ,~,..' ? r'~ September 8, 1988 < - · Mr. Alan Ratliff '~ City ~nager City of Coppell P. O. Box 478 Coppe11, Texas 7S019 Dear Mr. Ratliff: Attached is a letter proposal from DeShazo, Starek & Tan~ for the constmction administration of the drainage facilities along Minyard propert i es. ~d.s fire has provided all of the desi~ of the project and is the most f~iliar and qualified to provide construction a&inistratkon, shop drawing reviews, mater-tals testing reviews, and answer any questions about the project durin~ the constn~ction phase. We reco~end that rids contract be approved. Sincerely, 11. Wa)me Gi~, P.E. tgm/mj 1711)3 Ihc.,.ltm Ilo.'td · Suitt: 1011 · I.B lib; · I~alla'.,. 'l'c×a,, 7524,'-;' · Pho~c Dallas, Texas 75202 7633 E. 63rd. Place Austin. Texas 78701 (21.1) 748-67,10 Tulsa, Oklahoma 74133 (512) 472-4214 Metro--263-5428 (918) 250-2621 o Sundance Square 120 West Third Street. Suite 210 Fort Worth, Texas 76102-7401 ~817) 332-2074 LETTER OF TRANSMITTAL WE ARE ENCLOSING: No Copies Description For Your Use As Requested For Your Approval Approved as Noted REMARKS: ,-~r,o~-.I - ~,,- t' .,,.~'i : ,,~ ~,,-' ~-,.,,,.". COPY TO: SIGNEDC " / I/  D ¢Shazo. Starck & Tang. Inc. EnL~ineers · Planners .11.~(} 1. ilJoll Station · I)tdl:ts. 'l'rx~,~ ~.~21;2 · 214 September 7, 1988 Mr. Alan Ratliff City Manager City of Coppell 255 Parkway Blvd. Coppell, Texas Re: Bethel Road Drainage Improvements Post Office Site to Freeport Parkway Construction Administration 88157.04 Dear Mr. Ratliff: In accordance with our discussions with Mr. Wayne Ginn, the City's consultant, we have prepared this proposal for providing construc- tion administration for construction of Bethel Road Drainage Improvements from the Post Office Site to Freeport Parkway. Two copies of this proposal are enclosed. We prepared the construction plans for both this project as well as the Royal Lane Pavement from LBJ to Bethel Road. We propose to provide the following services: A. Review shop drawings; B. Review test results; C. Review and approve contractor applications for payment; D. Make periodic visits to the site to monitor general contract compliance; E. Resolve claims, disputes and other matters between the contractor and the City; F. Attend meetings as requested by Minyard's, the project in- spector and City officials; G. Provide other services as requested. We propose to provide these services on an hourly rate basis in accordance with the attached rate schedule provided the project is completed within 365 days (contract time for construction is 230 days). Mr. Alan Ratliff September 7, 1988 Page 2 Subcontract services such as, but not limited to, materials testing will be provided on a cost plus 10% basis. Payment for authorized services will be due upon presentation of our monthly statements for such services. If this proposal meets with your approval, please execute both copies and return one copy to us. Please call me or Clyde Sifford if you have any questions. We appreciate this opportunity to be of service. Sincerely, Paul A. Lipscomb, P.E. Vice President PAL/CLS/np encl ACCEPTED: CITY OF COPPELL By: Title: Date: CIVIL CONSULTANT'S HOURLY RATE SCHEDULE September 1988 - September 1989 Hourly Rate Principal $100 Director $ 75 - 85 Project Manager $ 55 - 75 Project Engineer $ 45 - 60 Design Engineer $ 35 - 45 Technician $ 35 - 53 Draftsman $ 22 - 35 Surveyors $ 17 - 35 Secretarial $ 24 - 42