ST9904-CS 990922 (2) * SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS
e Subregion
2 I.H. 20 Windin~l Trail Frontale roads, EB & WB FY2002 1.50 1.50
$700K local ($300K Grand Prairie
3 I.H. 30 MacArthur E. to RR Frontep roads FY2004 7.3C 6.6(3 & rv400K Dallas County)
beck N. of Lake
4 I.H. 35E Gap in Lewisvilla Lewisvilla Brkl~le FY2001 3.0( 3.043
Construction of auxiliary
lanes for bottleneck
5 I.H. 635 Montfort to LaPrada removals (7) FY2003 4.2(: 4.2(3 -
$5M District Discretionary,.
$7M Coilin County,
Dallas North Toll Road to $1M PIano,
6 S.H. 121 S.H. 289 (Preston) FY2002 34.3t 20.30 $1M Frlsco
Widen to 4-lane divided '
7 8.H. 78 F.M. 544 to Eubanks rural FY2001 4.8C 4.8C
Existing U.S. 287 to E. of Widen to 4-lane divided
8 U.S. 287 Sardls rural hi~lhway FY2001 17.9(: 11.50 $6.40 Cat 15--Fed Demo
Widen to 6-lane divided
9 U.S. 380 I.H. 35 to U.S. 77 urban FY2004 3.~ 3.50
10 U.8. 75 At Churcltl Way Transit 8ecess/P&R FY2002 3.0~ 3.00
11 U.S. 77 At I.H. 35E ramp FY2004 2.0C 2.0C '
Recon~guration;
continuous fTontege mad;
flood reli~ fratght
12 U.S. 80 Town East to Gross Road accessle~lress FY2003 4.50 4.50
RTC/TTC Partnership project;
13 I.H. 20 I.H. 35E to I.H. 45 Fronta~le roads FY2004 14.9C 5.50 $5.00 $4.9M local
Construct EB frontage
Webb Chapel to Marsh roads, rehab ramps, noise Switch out the previous $8 million
14 I.H. 635 iLene walls FY2002 24.50 8.00 16.50 RTCRTC Partnership money
S.H. 289 (Preston) to U.S. Switch out the previous $5 million
15 S.H. 121 175 ,Fronta~le roads only FY2001 40.0C 12.00 28.00 RTC/TTC Partnership money
9/22/99
SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS
Eastern Subregion
Additional
Letting Total Cost Commission Additional
ProJlect Limits scope of Work Date (millions) STP-M M Strategic Priority NHS Comments
Switch out the previous $6 million
Spur 366 RTC/TTC Partnership money (A);
Woodall I.H. 35E to Beckley/ Extend Spur 366 over the $28M City of Dallas ($10M Dallas
16 Rodgers) Singleton Trinib/River FY2002 52.0C 10.00 14.00 County ROW not included)
Johnson C-L to W. of Widen to 4-lane divided
17 U.S. 287 Midlothian rural FY2001 17.86 9.86 8.00 RTC/TTC Partnership proiect
w. of Midlothian to Loop Construct 4-lane divided
18 U.S. 287 489 (Midlothian Bypass) rural on new location FY2003 8.55 1.00 7.55 RTC/TTC Partnership project
Widen to 4-lane undivided Switch out the previous $1 million
19 U.S. 77 S.H. 342 to U.S. 287 rural FY2001 10.5C 4.00 6,5 RTC/TTC Partnership money (A)
Widen to 8 lanes, HOV,
W. of Loop 12 to E. of and add interchanges &
20 I.H. 30 Westmoreland noise wall FY2001 55.0C 17.00 $38.0C
Interchange construction Interchange improvements
21 S.H. 161 Ext. (Plus) at S.H. 183 + FY2003 42.90 12.90 30.0C
Complete main lanes and
0.3 M. W. of Trophy Lake frontage roads for 6 lanes
22 S.H. 114 Dr. to Tarrant C-L of ultimate 8-lane freeway FY2003 21.60 10.00 11.6C
SIB Loan of $10M ($10M cities
payback),
S.H. 114 to Dallas North Fully construct limited FY2003, $8.25M Denton Co. Bond,
23 S.H. 121 Toll Road access facility FY2004 145.80 30.00 97.55 $97.55 additional NHS
24 S.H. 161 I.H, 20 to North of I.H. 30 Frontage roads FY2003 52.80 22.80 30.00
SUBTOTAL $578.71 $213.76 $85.55 $207.15
(A) By switching out the previous RTC/TTC partnership funds with new STP-MM, a cost overrun fund can be created, while programming all available new funds.
9/22/99
SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS
Western Subregion
Additional
Letting Total Cost Commission Additional
Project LImits Scope of Work Date (millions) STP-MM Strategic Priority NHS Comments
Dick Price Road to Eden see NCTCOG Project 1763; PE &
I BUS. 287P Road Widen 2 to 5 lanes FY2000 $8.04 $7.52 ROW funded ($0.5M)
F.M. 731
2 (RM/UM) F.M. 1187 to Johnson C-L Widen 2 to 4-lane divided FY2002 6.85 6.85
F.M. 3029
(Precinct S.H. 1211S.H. 183 to
3 Line) S.H. 26 Widen 4 to 6-lane divided FY2002 7.92 5.11 PE &ROW funded ($2.81M)
4 F.M. 156 U.S. 287 to Watauga Road Widen 2 to 4-lane divided FY2002 8.95 8.95
Watauga Road to 0.3 mi.
north of IH 820 Widen 2 to 4-lane divided FY2002 3.19 3.19
5 S.H. 10 Bell Spur to Westpark Way Widen 4 to 6-1ane divided FY2002 4.71 4.71
6 U.S. 377 S.H. 170 to F.M. 1709 Widen to 4-lane divided FY2003 6.35 6.35
Interchange at Heritage
7 U.S. 287 Parkway Interchange FY2002 4.63 4.63
Ellis County Line to 1.2 mi. Complete 4-lane divided
north of Ellis County Line section FY2003 2.49 2.49
Frontage roads to
CR 521 (Lone Star Road) complete Heritage Pkwy.
to Tarrant County Line interchange FY2003 2.50 2.50
8 BUS 114L Wall Street to S.H. 114 ~Widen 2 to 5 lanes FY2003 5.20 5.20
WB at Blue Lake (2), EB at
Ramps near Woodhaven Brentwood Stair (2), and
9 I.H. 30 and Bridgewood Ramp improvements FY2002 2.53 2.53 Bridgewood (1)
Switch out the previous $13
million RTC/TTC partnership
money (A); 1998 Partnership
Program carryover for 2002;
10 S.H. 121 I.H. 30 to Alta Mesa Interchanges FY2002 244.90 20.00 $47.64 remainder funded
Switch out the previous $7 million
RTC/TTC partnership money (A);
$35M coming from Cat. 2-
11 I.H. 820 I.H. 35W to S.H. 26 Reconstruct freeway FY2004 85.80 15.59 19.71 $15.50 Interstate Maintenance
9/22/99
SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS
Western Subregion
Additional
Letting Total Cost Commission Additional
Project Limits Scope of Work Date (millions) STP-MM Strategic Priority NHS Comments
Previous RTC/TTC partnership
program: $3M STP-MM, $11.7
12 Rosedale I.H. 35W to I.H. 820 FY2003 14.70 [3.00 11.70 Commission Discretionary
Widen 6 to 8 lanes and
13 S.H. 360 I.H. 20 to N. of Randol Mill bottleneck removal FY2004 39.5( 14.50 25.0C Fix bottleneck at Division
SUBTOTAL $448.26 $110.12 $79.05 $40.5(]
(A) By switching out the previous RTC/TTC partnership funds with new STP-MM, a cost overrun fund can be created. while programming all available new funds.
9/22/99