Loading...
ST9904-CS 990922 (2) * SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS e Subregion 2 I.H. 20 Windin~l Trail Frontale roads, EB & WB FY2002 1.50 1.50 $700K local ($300K Grand Prairie 3 I.H. 30 MacArthur E. to RR Frontep roads FY2004 7.3C 6.6(3 & rv400K Dallas County) beck N. of Lake 4 I.H. 35E Gap in Lewisvilla Lewisvilla Brkl~le FY2001 3.0( 3.043 Construction of auxiliary lanes for bottleneck 5 I.H. 635 Montfort to LaPrada removals (7) FY2003 4.2(: 4.2(3 - $5M District Discretionary,. $7M Coilin County, Dallas North Toll Road to $1M PIano, 6 S.H. 121 S.H. 289 (Preston) FY2002 34.3t 20.30 $1M Frlsco Widen to 4-lane divided ' 7 8.H. 78 F.M. 544 to Eubanks rural FY2001 4.8C 4.8C Existing U.S. 287 to E. of Widen to 4-lane divided 8 U.S. 287 Sardls rural hi~lhway FY2001 17.9(: 11.50 $6.40 Cat 15--Fed Demo Widen to 6-lane divided 9 U.S. 380 I.H. 35 to U.S. 77 urban FY2004 3.~ 3.50 10 U.8. 75 At Churcltl Way Transit 8ecess/P&R FY2002 3.0~ 3.00 11 U.S. 77 At I.H. 35E ramp FY2004 2.0C 2.0C ' Recon~guration; continuous fTontege mad; flood reli~ fratght 12 U.S. 80 Town East to Gross Road accessle~lress FY2003 4.50 4.50 RTC/TTC Partnership project; 13 I.H. 20 I.H. 35E to I.H. 45 Fronta~le roads FY2004 14.9C 5.50 $5.00 $4.9M local Construct EB frontage Webb Chapel to Marsh roads, rehab ramps, noise Switch out the previous $8 million 14 I.H. 635 iLene walls FY2002 24.50 8.00 16.50 RTCRTC Partnership money S.H. 289 (Preston) to U.S. Switch out the previous $5 million 15 S.H. 121 175 ,Fronta~le roads only FY2001 40.0C 12.00 28.00 RTC/TTC Partnership money 9/22/99 SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS Eastern Subregion Additional Letting Total Cost Commission Additional ProJlect Limits scope of Work Date (millions) STP-M M Strategic Priority NHS Comments Switch out the previous $6 million Spur 366 RTC/TTC Partnership money (A); Woodall I.H. 35E to Beckley/ Extend Spur 366 over the $28M City of Dallas ($10M Dallas 16 Rodgers) Singleton Trinib/River FY2002 52.0C 10.00 14.00 County ROW not included) Johnson C-L to W. of Widen to 4-lane divided 17 U.S. 287 Midlothian rural FY2001 17.86 9.86 8.00 RTC/TTC Partnership proiect w. of Midlothian to Loop Construct 4-lane divided 18 U.S. 287 489 (Midlothian Bypass) rural on new location FY2003 8.55 1.00 7.55 RTC/TTC Partnership project Widen to 4-lane undivided Switch out the previous $1 million 19 U.S. 77 S.H. 342 to U.S. 287 rural FY2001 10.5C 4.00 6,5 RTC/TTC Partnership money (A) Widen to 8 lanes, HOV, W. of Loop 12 to E. of and add interchanges & 20 I.H. 30 Westmoreland noise wall FY2001 55.0C 17.00 $38.0C Interchange construction Interchange improvements 21 S.H. 161 Ext. (Plus) at S.H. 183 + FY2003 42.90 12.90 30.0C Complete main lanes and 0.3 M. W. of Trophy Lake frontage roads for 6 lanes 22 S.H. 114 Dr. to Tarrant C-L of ultimate 8-lane freeway FY2003 21.60 10.00 11.6C SIB Loan of $10M ($10M cities payback), S.H. 114 to Dallas North Fully construct limited FY2003, $8.25M Denton Co. Bond, 23 S.H. 121 Toll Road access facility FY2004 145.80 30.00 97.55 $97.55 additional NHS 24 S.H. 161 I.H, 20 to North of I.H. 30 Frontage roads FY2003 52.80 22.80 30.00 SUBTOTAL $578.71 $213.76 $85.55 $207.15 (A) By switching out the previous RTC/TTC partnership funds with new STP-MM, a cost overrun fund can be created, while programming all available new funds. 9/22/99 SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS Western Subregion Additional Letting Total Cost Commission Additional Project LImits Scope of Work Date (millions) STP-MM Strategic Priority NHS Comments Dick Price Road to Eden see NCTCOG Project 1763; PE & I BUS. 287P Road Widen 2 to 5 lanes FY2000 $8.04 $7.52 ROW funded ($0.5M) F.M. 731 2 (RM/UM) F.M. 1187 to Johnson C-L Widen 2 to 4-lane divided FY2002 6.85 6.85 F.M. 3029 (Precinct S.H. 1211S.H. 183 to 3 Line) S.H. 26 Widen 4 to 6-lane divided FY2002 7.92 5.11 PE &ROW funded ($2.81M) 4 F.M. 156 U.S. 287 to Watauga Road Widen 2 to 4-lane divided FY2002 8.95 8.95 Watauga Road to 0.3 mi. north of IH 820 Widen 2 to 4-lane divided FY2002 3.19 3.19 5 S.H. 10 Bell Spur to Westpark Way Widen 4 to 6-1ane divided FY2002 4.71 4.71 6 U.S. 377 S.H. 170 to F.M. 1709 Widen to 4-lane divided FY2003 6.35 6.35 Interchange at Heritage 7 U.S. 287 Parkway Interchange FY2002 4.63 4.63 Ellis County Line to 1.2 mi. Complete 4-lane divided north of Ellis County Line section FY2003 2.49 2.49 Frontage roads to CR 521 (Lone Star Road) complete Heritage Pkwy. to Tarrant County Line interchange FY2003 2.50 2.50 8 BUS 114L Wall Street to S.H. 114 ~Widen 2 to 5 lanes FY2003 5.20 5.20 WB at Blue Lake (2), EB at Ramps near Woodhaven Brentwood Stair (2), and 9 I.H. 30 and Bridgewood Ramp improvements FY2002 2.53 2.53 Bridgewood (1) Switch out the previous $13 million RTC/TTC partnership money (A); 1998 Partnership Program carryover for 2002; 10 S.H. 121 I.H. 30 to Alta Mesa Interchanges FY2002 244.90 20.00 $47.64 remainder funded Switch out the previous $7 million RTC/TTC partnership money (A); $35M coming from Cat. 2- 11 I.H. 820 I.H. 35W to S.H. 26 Reconstruct freeway FY2004 85.80 15.59 19.71 $15.50 Interstate Maintenance 9/22/99 SUPPLEMENTAL CATEGORY 4C STP-MM PROJECTS Western Subregion Additional Letting Total Cost Commission Additional Project Limits Scope of Work Date (millions) STP-MM Strategic Priority NHS Comments Previous RTC/TTC partnership program: $3M STP-MM, $11.7 12 Rosedale I.H. 35W to I.H. 820 FY2003 14.70 [3.00 11.70 Commission Discretionary Widen 6 to 8 lanes and 13 S.H. 360 I.H. 20 to N. of Randol Mill bottleneck removal FY2004 39.5( 14.50 25.0C Fix bottleneck at Division SUBTOTAL $448.26 $110.12 $79.05 $40.5(] (A) By switching out the previous RTC/TTC partnership funds with new STP-MM, a cost overrun fund can be created. while programming all available new funds. 9/22/99