ST9904-CS 990709 (2) S.I.B. Workshop 7/9/99 Purpose: Update progress relating to the SH 121 Bypass mainlanes and funding source. 1 ) Welcome & intro 2) Review the main points a) stoplight overpass b) lack of state funding for freeway- alternatives c) county S.I.B. team-leverage co rd bond $8.25 mil 3) New findings a) leverage same dollars for entire project - S.I.B. ---13) need local assistance c) schedule of completion based on greatest traffic need d) tollway option 4) Critical-juncture in the process a) TxDot: District & State b) County's position c) all the agencies must work together 5) County continue along this path a) S.I.B. team process/cost b) problem with Commitment- must be together ., c) tollway may be better option 6) July 14th Meeting: Jay Nelson a) importance - who should attend b) critical points ~.+~-~- ~ SH 121 STATE INFRASTRUCTURE BANK LOAN Overview , Denton County has $8.25 million in Bond Program for SH 121. , Traffic congestion along SH 121 requires expedited main lane construction. , Denton County began review of funding options for SH 121 to include the SIB and tolls. Objective , Utilize existing BSRP funds in conjunction with SIB funds to leverage the timing and construction of SH 121. Benefits , The region gets a much-needed roadway constructed sooner than would otherwise be possible. · TxDOT receives local participation in design and construction. -, · Construction costs are less using current year dollars. Drawbacks · This type of SIB loan has not been done in Texas · No SIB loan has been done the North Texas Region , Advances out year dollars to current year Vs. Toll Roads · A SIB loan will require local participation commitments up front. · The Toll option will require local participation if access is needed. · Construction utilizing SIB funding will begin where traffic need is greatest ( i.e. the IH_35E/SH 1~21 Interch~ange). · . A Toll project will extend from its existing location ( i.e. begin at the DNT and proceed towards DFW Airport as toll revenue warranted). Necessary Steps · Continue to develop a viable SIB Loan application. , Meet with Dallas District Engineer Jay Nelson (7/14/99). · Brief Interim TxDOT Finance Director on SIB Loan (7/15-16/99) · Develop a programming process acceptable to TxDOT Dallas (7/99) · Meet with A1 Luedke/TxDOT Austin regarding programming (7/99) · Local government approval of SIB application (8/99) · SIB Application Submission (9/99) · Commission review and action (9/99-12/99)