Loading...
Minyard-LR 961202[:~,w~ ~&A~*~_*iA~ M~teFi~l~ Ta~tirtG Te'. L~rrv P~*4~: Date: 12t18/g§ Time: 00:20:41 _ Page 5 of 9 CONCRETE CYLINDER TEST REPORT Minyard's Faoility Expansion Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: Minyard Properties REPORT NO. 82 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 12-02-96 Coppell, Texas 75019 TECHNICIAN: J. Gray Mr. Marion Pritchett CONTRACTOR: Facility Construction Management, Inc. Location of Sample Set Number I Location I Quantity Represe~l_ted 1 Paving - 235:S, 90:E of NE building corner 20~340 'y'ds 2 Paving - 210:S 95'E of NE building corner 60/340 yds 3 Paving - 220'S. 135:E of NE building corner !00!340 yds 4 Paving -. ~50 S. 135'E of NE building corner 160/340 yds 5 Pawng - 140'S, 100'E of NE building corner 210/340 yds 6 Paving - 40'S, 95'E of NE building corner 260/340 yds 7 Paving - 15=S 140'E of NE building corner 310/340 yds Design Information 'l S°urce °f I -: -" Set Number Concrete -Mix Identification Specified Strength p.s.i. 1 TXI 8284 4000 2 TX! 8284 4000 3 Tv . .-..I 8284 .4000 4 '~-XI 8284 4000 5 TX~ 8284 4000 6 TXi 8284 4000 7 TXi 8284 4000 Test Results Set 1 CylinderI I Age ~ I Total Load I Compressive I Average Strength No. .' ID Date Tested Test .lbs. Strength p.s,i. -p.s.i. I 8158 12-09-96 7 72800 2580 8158 12-30-96 28 8! 58 I;2-30-96 28 8158 Hold 2 8159 12-09-96 7 74000 2620 8159 ~ 2-30-96 28 8! 59 ! 2-30-96 28 8159 ~-ioid 3 8160 12-09-96 7 66300 2350 8!60 !2-30-96 28 8160 !2-30-96 28 8160 Hold From: Construction ~lat~rial~ Te3tJn~ To: Lam/D__avis Date: 12/18/9§ Time: 00:22;33 _ Pete ~ of 9 No. - 'ID Date Tested Test lbs. Strength p.s.i. _ . .. 4 8161 12-09-96 7 75900 2690 8161 12-30-96 28 8161 12-30-96 28 8161 Hold 5 8162 i .2_-09-96 7 76800 2720 8162 12-30-96 28 8162 12-30-96 28 8162 Hold 6 8163 12-09-96 7 72000 2550 8163 12-30-96 28 8163 12-30-96 28 8163 Hold 7 8164 ! 2-09-96 7 63000 2230 8164 ! 2-30-96 28 8164 i 2-30-96 28 8164 Hold Cylinder Data Set I Cylinder I' I Concrete-t Air Timeof TicKet No. ID Slump Air Temp.. Temp. Entrainment Sample Number ! '8158 4 75 4! 58 4.8 06:20 AM 711351 2 8159 5 00 41 58 5 0 06:55,*,,,.'"'~ 741355, . . '~ 8160 .~ 0C d'., 58 5.0 07'30/~M 4 8161 .,~ 00 42 58 5 ~n 08:01 ,-,~w'" '" 711373 5 8i62 4 75 42 58 5.2 08.33 AM 71 6 8!63 5 00 42 58 5.1 09:15 AM 71 !396 '; 8!64 5.00 44 58 4 9 09:4! AM 711410 Distribution: (1) Minyard Properties/ Submitted by: Mr. Marlon Pritchett (1) Facility Construction Management/ REED ENGINEERING GROUP, INC. Mr. Dirk Harrison (1) City of Coppell,'Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Facility Construction Management/ Keith E. Atkins Mr. Bill Moultrie KEA/cd! (1) Facility Engineering, Inc./ Ms. Terry Fernandez (1) Dalcan, Inc./Mr. Jim Renaud