Northlake 635(4)-LR010613GEOTECHNICAL AND J~i F=;J r-'l I I p
EN¥IRONMENTaL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T, McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 109
REPORT DATE: 06-13-01
REG PROJECT NO. 7044
DATE OBSERVED: 05-15-01
TECHNICIAN: F. Steadman
PAGE: 1 of 1
Items Observed: J Paving: north entrance from Lakeshore Drive. Parking
N.E. corner of building north to property line and 40'W.
Reference Plans or Notes Used: J C5.1
~ X ~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/myw
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019