Loading...
Northlake 635(4)-LR010416GEOTECHNICAL AND ~ F~ I'-'1 I II p ENVIRONMENTAL CONSULTANTS REPORTED TO: REPORT OF BUILT-UP ROOFING OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire General Contractor: J Bob Moore Construction Co. [Roofing Contractor: ]H.E.C I Location of Work: REPORT NO. 96 REPORT DATE: 04-16-01 REG PROJECT NO. 7044 DATE OBSERVED: 03-20-01 TECHNICIAN: C. McEntee PAGE: 1 of 1 Weather Conditions: Sunny [Temperature Range: ] 42° Roof: Line A to D between line 10 and 14. J Operations Observed: J Application of base flashing with hot asphalt and nails. Also, install of an expansion joint. Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x J Specified Temperatures J Asphalt Kettle Temperature:J 500° +/- 25 F JApplication (EVT): J 475° +/- 25 F Actual Temperatures Asphalt / Pitch Kettle Temperature: Time Temp. Application (EVT): Time Temp. AM type, III Asphalt 10:00 am 525° AM type, III Asphalt 10:15 am 495° PM type, III Asphalt 1:15 pm 520° PM type, III Asphalt 1:30 pm 490° Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019