Northlake 635(4)-LR010416 (2) GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
Coppell Tech Center II
REPORTED TO:
1322 Crestside
Coppell, Texas
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 97
REPORT DATE: 04-16-01
REG PROJECT NO. 7044
DATE OBSERVED: 03-22-01
TECHNICIAN: C. McEntee
PAGE: 1 of 1
General Contractor: IBob Moore Construction Co. Weather Conditions: ISunny & Windy
Roofing Contractor: H.E.C Temperature Range: I 46°/70°
Location of Work: I Roof: Lines A to D between 14 to 19 and A to B.5 between
10 and 14.
Operations Observed: I Application of gravel and flood coat of hot asphalt
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
J Specified Temperatures J
Asphalt Kettle Temperature:I 500° +/- 25 F IApplication (EVT): I 475° +/- 25 F
Actual Temperatures
Asphalt / Pitch Kettle Temperature: Time Temp. Application (EVT): Time Temp.
AM type III 9:35 am 540° AM type III 9:39 am 512°
PM type III 2:13 pm 510° PM type III 2:27 pm 485°
Comments:
Advised kettle temperature was too hot which was then corrected. HEC
foreman informed me the electrician drilled holes though the flashing around
the scuppers and will be repaired at a later date.
Mail
Distribution: (1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019