Loading...
Northlake 635(4)-LR010416 (4)GEOTECHNICAL AND ~ J:=;J r'-'l U P ENVlRONPIENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire General Contractor: ]Bob Moore Construction Co. Roofing Contractor: H.E.C REPORT NO. 98 REPORT DATE: 04-16-01 REG PROJECT NO. 7044 DATE OBSERVED: 03-23-01 TECHNICIAN: C. McEntee PAGE: 1 of 1 Weather Conditions: I Sunny Temperature Range: 45°/70° J Location of Work: J Roof: Lines B.5 to D, between 10 to 14 and A to B.8 between 1 and 10. J Operations Observed: J Application of gravel and flood coat of hot asphalt. Items Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x Debris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x I Specified Temperatures Asphalt Kettle Temperature:J 500° +/- 25 F JApplication (EVT): J 475° +/- 25 F Actual Temperatures Asphalt / Pitch Kettle Temperature: J Time Temp. Application (EVT): Time Temp. AM type, III Asphalt J10:23 am 520° AM type, III 10:44 am 440° PM type, III AsphaltJ 2:10 pm 500° PM type, III 2:20 pm 475° Comments: Holes drilled through the scupper openings were repaired. Mail Distribution: (1) (1) (1) (1) (1) (1) Bob Moore Construction Co./ Mr. Ed T. McGuire City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone McHale Consulting Engineering/ Mr. Gary McHale CMC-Commercial Realty/ Mr. Steve Huff AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 StUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019