Northlake 635(4)-LR010405 GEOTECHNICAL AND J
ENVIRONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
REPORT NO. 102
REG PROJECT NO. 7044
SAMPLE DATE: 04-05-01
TECHNICIAN: H. Johnson
Set Number J Location
J Quantity Represented
Sidewalk: 10'S, 330'E of S.W. corner of west wing 10/30
of building
Design Information
Source of Concrete J Mix Identification J Specified Strength p.s.i.
TXI 8204 3000
Test Results
No.Set CylinderlID
1 5462
5462
5462
Date Tested
Age @
Test
04-12-01 7
05-03-01 28
05-03-01 28
ITotal Load Compressive I Average
lbs. Strength p.s.i. Strength p.s.i.
84580 2990
Cylinder Data
Set
Cylinder J Time of
ID SlumpJ Sample
5462 5.00 12:40PM
I Concrete Air
Air Temp. Temp. Entrainment
Ticket
Number
70 74 3.8 2856196
Mail
Distribution: (1)
Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019