Loading...
Northlake 635(4)-LR010405 (2) GEOTECHNICALAND J ~ F~l I-~ I I F~ ENVIRONt4ENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 A'I'TN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number I Location REPORT NO. 102 REG PROJECT NO. 7044 SAMPLE DATE: 04-05-01 TECHNICIAN: H. Johnson Quantity Represented 1 Sidewalk: 10'S, 330'E of S.W. corner of west wing 10/30 of building Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 8204 3000 Test Results No.Set CylinderlID 1 5462 5462 5462 Age@ Total Load I CompressiveI Average Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 04-12-01 7 84580 2990 05-03-01 28 110890 3920 05-03-01 28 116820 4130 4O3O Cylinder Data SetI Cylinder I l N~. ID Slump 5462 5.00 Time of Concrete Sample Air Temp. Temp. 12:40PM 70 74 Air I Ticket Entrainment Number 3.8 2856196 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019