Northlake 635(4)-LR010329 (2) GEOTECNNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 101
REG PROJECT NO. 7044
SAMPLE DATE: 03-29-01
TECHNICIAN: C. McEntee
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
I Set Number I Location
1
J Quantity Represented J
Slab leaveout at A.1-5.5 10/75
I
Design Information
Source of Concrete
TXI
Mix Identification45 I Specified 3000Strength p.s.i. I
Test Results
Set Cylinder J
No. ID Date Tested
1 5203 04-05-01
5203 04-26-01
5203 04-26-01
5203 Hold
I Age @ J Total Load I Compressive Average
Test lbs. Strength p.s.i. Strength p.s.i.
7 69480 2460
28 108660 3850
28 106810 3780
H
382O
Cylinder Data
Set Cylinder
N1o. ID
5203
Timeof J r Concrete Air Ticket J
Sample Air Temp. Temp. Entrainment Number
12:00PM 59 61 N/A 2850236
Slump
4.00
Mail
Distribution: (1)
Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC,
Odginal Signed By
Keith Atkins
KENje
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,. TEL [214] 350 5600 · FAX [214] 350 0019