Northlake 635(4)-LR010328GEOTECHNICAL AND ~ F:::I I'-1
ENVIRONMENTAL CONSULTANTS
REPORTED TO:
REPORT OF BUILT-UP ROOFING OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 89
REPORT DATE: 03-28-01
REG PROJECT NO. 7044
DATE OBSERVED: 03-16-01
TECHNICIANS: T. Belew &
C. McEntee
PAGE: 1 of 1
General Contractor: Bob Moore Construction Co. Weather Conditions: ISunny
Roofing Contractor: HEC Temperature Range: 38°/65°
Location of Work: I Roof column lines A to B.2 from 10 to 14.
Operations Observed: I Application of Fresco using screws and washers and
application of 4 ply felt using hot asphalt.
IWork Completed: I Insulation: 7,200 Sq.ft
Items Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x Debris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
I Specified Temperatures I
Asphalt Kettle Temperature:I 500° +/- 25 F IApplication (EVT): I 475° +/- 25 F
I Actual Temperatures
Asphalt/Pitch Kettle Temperature: I Time Temp. IApplication (EVT):
Typelll, Asphalt112:15 pm 550° I
Asphalt
Comments:
Mail
Distribution:
Adsived HEC Foreman of a dry lap and high temperatures.
corrected.
Time
12:45 pm
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Both items were
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
AE/mm
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019