Northlake 635(4)-LR010320 (3) GEOTECHNICAL AND J G F=I I'"1 U F=~
ENVIRONMENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number I Location
REPORT NO. 95
REG PROJECT NO. 7044
SAMPLE DATE: 03-20-01
TECHNICIAN: F. Steadman
Quantity Represented
1 Slab leaveout: A-1 to B-1 and A-1 to A-4 20/70
Design Information
Source of Concrete I Mix Identification [ Specified Strength p.s.i.
TXI 45 3000
Test Results
Set Cylinder I
No. ID Date Tested
1 4814 03-27-01
4814 04-17-01
4814 04-17-01
4814 Hold
J Age@ TotalLoad J Compressive J Average
Test lbs. Strength p.s.i. Strength p.s.i.
7 80480 2850
28 118470 4190
28 120610 4270
H
423O
Cylinder Data
Set
Cylinder I Time of
ID SlumpI Sample
4814 5.00 8:45AM
I Concrete Air J Ticket J
Air Temp. Temp. Entrainment Number
39 58 N/A 2844110
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. UcGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. ,, SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019