Loading...
Northlake 635(4)-LR010320 (3) GEOTECHNICAL AND J G F=I I'"1 U F=~ ENVIRONMENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number I Location REPORT NO. 95 REG PROJECT NO. 7044 SAMPLE DATE: 03-20-01 TECHNICIAN: F. Steadman Quantity Represented 1 Slab leaveout: A-1 to B-1 and A-1 to A-4 20/70 Design Information Source of Concrete I Mix Identification [ Specified Strength p.s.i. TXI 45 3000 Test Results Set Cylinder I No. ID Date Tested 1 4814 03-27-01 4814 04-17-01 4814 04-17-01 4814 Hold J Age@ TotalLoad J Compressive J Average Test lbs. Strength p.s.i. Strength p.s.i. 7 80480 2850 28 118470 4190 28 120610 4270 H 423O Cylinder Data Set Cylinder I Time of ID SlumpI Sample 4814 5.00 8:45AM I Concrete Air J Ticket J Air Temp. Temp. Entrainment Number 39 58 N/A 2844110 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. UcGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. ,, SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019