Northlake 635(4)-LR010315 GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tach Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number I Location
REPORT NO. 104
REG PROJECT NO. 7044
SAMPLE DATE: 03-15-01
TECHNICIAN: W. Eberhardt
Quantity Represented
1 Paving: 80'N of N.W. building corner 30/40
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
TXI 8273 4000
Test Results
Set Cylinder Age@ Total Load I CompressiveI Average
No. ID Date Tested Test lbs. I IStrength p.s.i. Strength p.s.i.
1 4660 04-12-01 28 108810 3850
4660 04-12-01 28 147390 5220 4540
Cylinder Data
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 4660 4.50 12:07PM 68 68 3.8 2840757
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KENje
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019