REPORT OF PIER OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
A-FI-N: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 75
REPORT DATE: 02-20-01
REG PROJECT NO. 7044
TECHNICIAN: R. Estep
PAGE: 1 of 1
Screen wall
Date Pier No.
IPier Diameter Bell DiameterI Depth Before I Final Depth of
(inches) (inches) Bell (feet) Pier (feet)
01-26-01
P-22 24 48 15.6 15.9
P-20 24 48 15.7 16.2
P-19 24 48 15.3 15.8
P-18 24 48 15.8 16.3
P-17 24 48 15.8 16.2
P-16 24 48 15.3 16.0
P-15 24 48 16.0 16.5
P-14 24 48 16.0 16.4
P-13 24 48 15.0 15.6
P-12 24 48 16.0 16.4
Note: Piers are numbered 1-47 starting at the N.E. face of the building running counter clockwise.
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/myw