Loading...
Northlake 635(4)-LR010220 GEOTECHNICALAND J~ R r-i L.J ~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 A-FI-N: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 75 REPORT DATE: 02-20-01 REG PROJECT NO. 7044 TECHNICIAN: R. Estep PAGE: 1 of 1 Screen wall Date Pier No. IPier Diameter Bell DiameterI Depth Before I Final Depth of (inches) (inches) Bell (feet) Pier (feet) 01-26-01 P-22 24 48 15.6 15.9 P-20 24 48 15.7 16.2 P-19 24 48 15.3 15.8 P-18 24 48 15.8 16.3 P-17 24 48 15.8 16.2 P-16 24 48 15.3 16.0 P-15 24 48 16.0 16.5 P-14 24 48 16.0 16.4 P-13 24 48 15.0 15.6 P-12 24 48 16.0 16.4 Note: Piers are numbered 1-47 starting at the N.E. face of the building running counter clockwise. Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/myw 2424 STUTZ DR, - SUITE 400 - DALLAS, TX 75235 · TEL [214] 350 5600" FAX [214] 350 0019