Northlake 635(4)-LR010219GEOTECHNICALAND ~ F=~ I--I I I F==
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 82
REPORT DATE: 02-19-01
REG PROJECT NO. 7044
DATE OBSERVED: 02-07-01
TECHNICIAN: F. Gomez
PAGE: 1 of 1
Items Observed:
J Approach North and South of building.
Reference Plans or Notes Used: J Civil C5.1 detail 2.
LList Deviations Noted:
il) Miscellaneous debris on subgrade.
~ x ~The noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
Bob Moore Construction Co./
Mr. Ed T. McGuire
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
McHale Consulting Engineering/
Mr. Gary McHale
CMC-Commercial Realty/
Mr. Steve Huff
AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
KA/cg