Loading...
Northlake 635(4)-LR010207 GEOTECHNICAL AND J J~J R r-i U F~ ENVIRONHENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Location of Sample ISet Number I Location 1 Approach on south side REPORT NO. 83 REG PROJECT NO. 7044 SAMPLE DATE: 02-07-01 TECHNICIAN: F. Gomez J Quantity Represented 20/40 Design Information J Source of Concrete J Mix Identification TXI 8273 Specified Strength p.s.i. 4OOO Test Results Set Cylinder J Age @ No. IDI Date Tested Test TotalLoad lbs. 3709 02-14-01 7 96730 3709 03-07-01 28 123880 3709 03-07-01 28 136970 3709 Hold H CompressiveI Average Strength p.s.i. Strength p.s.i. 342O 4380 4850 462O Cylinder Data Set I Cylinder 3709 J Time of J Concrete Slump Sample Air Temp. Temp. 4.75 12:33PM 69 76 JAir Ticket Entrainment Number 3.9 2823443 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019