Northlake 635(4)-LR010207 (2) GEOTECHNICALAND J r~
ENVIRONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 83
REG PROJECT NO. 7044
SAMPLE DATE: 02-07-01
TECHNICIAN: F. Gomez
J Quantity Represented
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
J S
et Number J Location
I Approach on south side 20/40
Design Information
J Source of Concrete J Mix Identification J Specified Strength p.s.i.
TXI 8273 4000
Test Results
Set Cylinder I
No. ID Date Tested
1 3709 02-14-01
3709 03-07-01
3709 03-07-01
3709 Hold
Age@ TotalLoad ] Compressive J Average
Test lbs. Strength p.s.i. Strength p.s.i.
7
28
28
H
9673O 342O
Cylinder Data
Set Cylinder
3709
Time of J
Slump Sample Air Temp.
4.75 12:33PM 69
Concrete J Air J Ticket
Temp. Entrainment Number
76 3.9 2823443
~'~%ii
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KENje
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019