Loading...
Northlake 635(4)-LR010202GEOTECHNICAL AND ~ J:=:;I I'-I I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Screen wall Date Pier DiameterI Bell Diameter Pier No. (inches)I (inches) REPORT NO. 74 REPORT DATE: 02-02-01 REG PROJECT NO. 7044 TECHNICIAN: R. Estep PAGE: 1 of 1 Depth Before I Final Depth of Bell (feet) Pier (feet) 01-25-01 P-24 24 48 15.3 15.9 P-23 24 48 15.5 16.0 P-21 24 48 15.8 16.5 P-41 24 48 15.5 15.9 P-40 24 48 15.5 15.8 P-37 24 48 16.7 16.9 Note: Piers are numbered 1-47 starting at the N.E. face of the building running counter clockwise. Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * F^X [214] 350 0019