Northlake 635(4)-LR010202GEOTECHNICAL AND ~ J:=:;I I'-I I I ~
ENVIRONMENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Screen wall
Date
Pier DiameterI Bell Diameter
Pier No. (inches)I (inches)
REPORT NO. 74
REPORT DATE: 02-02-01
REG PROJECT NO. 7044
TECHNICIAN: R. Estep
PAGE: 1 of 1
Depth Before I Final Depth of
Bell (feet) Pier (feet)
01-25-01
P-24 24 48 15.3 15.9
P-23 24 48 15.5 16.0
P-21 24 48 15.8 16.5
P-41 24 48 15.5 15.9
P-40 24 48 15.5 15.8
P-37 24 48 16.7 16.9
Note: Piers are numbered 1-47 starting at the N.E. face of the building running counter clockwise.
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * F^X [214] 350 0019