Northlake 635(4)-LR010124GEOTECHNICAL AND ~ J==J I""1 LJ F=j
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number J Location
1 Panel # 44
REPORT NO. 77
REG PROJECT NO. 7044
SAMPLE DATE: 01-24-01
TECHNICIAN: B. Woolwine
J Quantity Represented
1 O/7O
Design Information
Source of Concrete
Mix Identification
Specified Strength p.s.i.
TXI 8273 3000
Test Results
SetNo. CylinderlID
1 3007
3007
3007
3007
Age @
Date Tested Test
01-31-01 7
01-31-01 7
02-21-01 28
02-21-01 28
Total Load J Compressive Average
lbs.I Strength p.s.i. Strength p.s.i.
94700 3350
90630 3210 3280
Cylinder Data
Set
Cylinder J Time of
ID SlumpJ Sample
3007 5.0 12:15PM
I Concrete Air Ticket
Air Temp. Temp. Entrainment Number
52 59 N/A 2813244
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019