Loading...
Northlake 635(4)-LR010124GEOTECHNICAL AND ~ J==J I""1 LJ F=j ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number J Location 1 Panel # 44 REPORT NO. 77 REG PROJECT NO. 7044 SAMPLE DATE: 01-24-01 TECHNICIAN: B. Woolwine J Quantity Represented 1 O/7O Design Information Source of Concrete Mix Identification Specified Strength p.s.i. TXI 8273 3000 Test Results SetNo. CylinderlID 1 3007 3007 3007 3007 Age @ Date Tested Test 01-31-01 7 01-31-01 7 02-21-01 28 02-21-01 28 Total Load J Compressive Average lbs.I Strength p.s.i. Strength p.s.i. 94700 3350 90630 3210 3280 Cylinder Data Set Cylinder J Time of ID SlumpJ Sample 3007 5.0 12:15PM I Concrete Air Ticket Air Temp. Temp. Entrainment Number 52 59 N/A 2813244 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019