Northlake 635(4)-LR010122 (2)GEOTECNNICAL AND I~ I==l I'-1 I I F:=
ENVIRONMENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Date
I Pier Diameterr Bell Diameter
Pier No. (inches) (inches)
REPORT NO. 69
REPORT DATE: 01-22-01
REG PROJECT NO. 7044
TECHNICIAN: B. Steadman
PAGE: 1 of 1
Depth Before Final Depth of
Bell (feet) Pier (feet)
01-08-01 28 24 48 16.3 16.6
29 24 48 15.2 15.9
30 24 48 15.5 15.8
31 24 48 15.4 15.7
32 24 48 15.8 16.3
33 24 48 15.7 15.8
34 24 48 15.4 15.7
46 24 48 15.7 16.2
45 24 48 15.4 15.8
44 24 48 15.4 15.8
43 24 48 15.5 15.8
40 24 48 15.4 15.8
01-09-01 38 24 48 15.5 15.5
39 24 48 15.2 15.5
35 24 48 15.6 15.9
36 24 48 15.3 15.5
27 24 48 15.4 15.4
47 24 48 16.3 16.9
Note: Pier locations shown on attached Plate 1.
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019