Northlake 635(4)-LR010112 (2) GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number J Location
REPORT NO. 71
REG PROJECT NO. 7044
SAMPLE DATE: 01-12-01
TECHNICIAN: R. Yeoman
J Quantity Represented
1 Panels 4 and 5 40/220
2 Panels 22 and 23 130/220
Design Information
l Source of Concrete I Mix Identification I Specified Strength p.s.i.
TXl 8273 4000
Test Results
Set Cylinder
No. ID Date Tested
1 2812 01-19-01
2812 02-09-01
2812 02-09-01
2812 Hold
2 2813 01-19-01
2813 02-09-01
2813 02-09-01
2813 Hold
Age@ Total Load I CompressiveI Average
Test lbs. Strength p.s.i. Strength p.s.i.
7
28
28
H
93300 3300
93230 3300
7
28
28
H
Cylinder Data
Set Cylinder I Time of
No. ID I Slump Sample
1 2812 4.75 5:35AM
2 2813 5.25 6:50AM
I Concrete Air Ticket
Air Temp. Temp. Entrainment Number
44 51 N/A 2807992
42 56 N/A 2808031
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KENje
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019