Northlake 635(4)-LR001227 (2) GEOTECHNICAL AND J~
ENVII~ONHENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
A-I-I'N: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 58
REPORT DATE: 12-27-00
REG PROJECT NO. 7044
TECHNICIAN: J. Stuart
PAGE: 1 of 1
I Pier Diameter Bell Diameter J Depth Before J Final Depth of J
Date Pier No. (inches) (inches) Bell (feet) Pier (feet)
12-11-00 D.1-0.8 18 36 16.4 16.6
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
~ Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Odginal Signed By
James F. Phipps, P.E.
BW/mm
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 ' FAX [214] 350 0019