Loading...
Northlake 635(4)-LR001219 (2)GEOTECHNICAL AND ~ F=I r"l I I Fa ENVIRONHENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 64 REG PROJECT NO. 7044 SAMPLE DATE: 12-19-00 TECHNICIAN: D. Draper Location of Sample Set Number J Location Quantity Represented Paving: 35'N,120'W of N.W. corner of building Paving: 40'N,65'E of N.W. corner of building Paving: 40'N,50'E of N.W corner of building 100/250 190/25O 220/220 Design Information Source of Concrete TXI Mix Identification 8273 Specified Strength p.s.i. 4000 Test Results Set CylinderI No. ID Date Tested 1 2243 12-26-00 2243 01 - 16-01 2243 01 - 16-01 2243 Hold Age @ Test 7 28 28 H 2 2244 12-26-00 7 2244 01-16-01 28 2244 01-16-01 28 2244 Hold H 3 2245 12-26-00 7 2245 01-16-01 28 2245 01-16-01 28 2245 Hold H JTotal Load J Compressive Average lbs. Strength p.s.i. Strength p.s.i. 93460 3310 98210 3480 82370 2910 Cylinder Data Set No. 1 2 3 Cylinder Time of ID Slump Sample 2243 6.00 9:00 AM 2244 5.00 10:00AM 2245 6.50 10:55 AM J Concrete Air Ticket Air Temp. Temp. Entrainment Number 35 40 N/A 2797039 35 40 N/A 2797218 35 40 N/A 2797264 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019