Loading...
Northlake 635(4)-LR001217GEOTECHNICAL AND ~ F~ ~--I I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 50 REPORT DATE: 12-17-00 REG PROJECT NO. 7044 TECHNICIAN: M. Silva PAGE: 1 of I ProctorI ASTM OptimumI Maximum No. Standard Description Moisture, % Density, PCF 1 D-698 Light brown clay 21.5 94.0 2 D-698 Olive brown clay (lime-treated) 20.5 96.0 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) ( %) ID Level (%) 118 12-06-00 Plumbing Trench: 50'S,100'W(1) 2.0 89.5 24.2 1 95.2 119 Plumbing Trench: 50'S,90'W(1 ) 1.0 90.8 22.2 1 96.5 120 Plumbing Trench: 75'S,20'W(1 ) 1.0 90.2 24.0 1 95.9 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.E corner of building pad. Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Odginal Signed By Ronald F. Reed, P.E. BW/mm 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019