Northlake 635(4)-LR001211 (2) GEOTECHNICAL AND I I;~ F:;I I'-1 I I F=~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tach Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 61
REG PROJECT NO. 7044
SAMPLE DATE: 12-11-00
TECHNICIAN: J. Stuart
Location of Sample
Set Number I Location I Quantity Represented
1 Pier # D.1-0.8 18/18
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
TXI 9505 3000
Test Results
Set CylinderI
No. ID Date Tested
1 2193 12-18-00
2193 12-18-00
2193 01-08-01
2193 01-08-01
Age@ Total Load I CompressiveI Average
Test lbs.I IStrength p.s.i. Strength p.s.i.
7 69390 2460
7 64050 2270
28
28
2370
Cylinder Data
Set I Cylinder Time of
I No. ID Slump Sample
II
2193 5.00 11:00AM 35
I Concrete I Air I Ticket
Air Temp. Temp. Entrainment Number
51 N/A 2794291
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019