Loading...
Northlake 635(4)-LR001211 (2) GEOTECHNICAL AND I I;~ F:;I I'-1 I I F=~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell Tach Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 61 REG PROJECT NO. 7044 SAMPLE DATE: 12-11-00 TECHNICIAN: J. Stuart Location of Sample Set Number I Location I Quantity Represented 1 Pier # D.1-0.8 18/18 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 9505 3000 Test Results Set CylinderI No. ID Date Tested 1 2193 12-18-00 2193 12-18-00 2193 01-08-01 2193 01-08-01 Age@ Total Load I CompressiveI Average Test lbs.I IStrength p.s.i. Strength p.s.i. 7 69390 2460 7 64050 2270 28 28 2370 Cylinder Data Set I Cylinder Time of I No. ID Slump Sample II 2193 5.00 11:00AM 35 I Concrete I Air I Ticket Air Temp. Temp. Entrainment Number 51 N/A 2794291 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019