Loading...
Northlake 635(4)-LR001208 (4) GEOTECHNICAL AND EN¥1RONMENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire REPORT NO. 60 REG PROJECT NO. 7044 SAMPLE DATE: 12-08-00 TECHNICIAN: D. Williams CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number I Location Quantity Represented Piers: D.4-4.4, C.3-1, B.7-1 and B.2-1 10/24 Design Information ISource of Concrete TXI Mix Identification Specified Strength p.s.i. 95O5 3000 Test Results Set Cylinder No. ID Age@ Total Load I CompressiveI Average Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 2104 2104 2104 2104 12-15-00 7 01-05-01 28 01-05-01 28 Hold H 73890 2610 Cylinder Data Set No, 1 Cylinder I Timeof ID Slump Sample Air Temp. 2104 5.00 3:00PM 60 Concrete Air I Ticket Temp. Entrainment Number 65 N/A 2793738 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019