Loading...
Northlake 635(4)-LR001206 GEOTECHNICALAND J G J~J I"1 i I ENVIRONHENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire REPORT NO. 54 REG PROJECT NO. 7044 SAMPLE DATE: 12-06-00 TECHNICIAN: D. Williams CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number J Location 1 Quantity Represented Piers: D.1-9.3, D.1-9.1, D.1-8.6 and D.1-8.4 10/25 Design Information Source of Concrete TXI Mix Identification 9505 Specified Strength p.s.i. 3000 Test Results Set CylinderI No. ID Date Tested 1 1953 12-13-00 1953 01-03-01 1953 01-03-01 1953 Hold Age @ Test Total Load Compressive I Average lbs. Strength p.s.i.I Strength p.s.i. 7 90160 3190 28 140310 4970 28 140740 4980 H 4980 Cylinder Data Set Cylinder Time of ID Slump Sample 1953 4.00 1:45PM J I Concrete Air Ticket J Air Temp. Temp. Entrainment Number 50 60 N/A 2791142 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019