Northlake 635(4)-LR001206 GEOTECHNICALAND J G J~J I"1 i I
ENVIRONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 54
REG PROJECT NO. 7044
SAMPLE DATE: 12-06-00
TECHNICIAN: D. Williams
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number J Location
1
Quantity Represented
Piers: D.1-9.3, D.1-9.1, D.1-8.6 and D.1-8.4
10/25
Design Information
Source of Concrete
TXI
Mix Identification
9505
Specified Strength p.s.i.
3000
Test Results
Set CylinderI
No. ID Date Tested
1 1953 12-13-00
1953 01-03-01
1953 01-03-01
1953 Hold
Age @
Test
Total Load Compressive I Average
lbs. Strength p.s.i.I Strength p.s.i.
7 90160 3190
28 140310 4970
28 140740 4980
H
4980
Cylinder Data
Set
Cylinder Time of
ID Slump Sample
1953 4.00 1:45PM
J I Concrete Air Ticket J
Air Temp. Temp. Entrainment Number
50 60 N/A 2791142
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019