Northlake 635(4)-LR001205 GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
AT'I'N: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
REPORT NO. 56
REG PROJECT NO. 7044
SAMPLE DATE: 12-05-00
TECHNICIAN: J. Stuart
Set Number J Location
1
Quantity Represented
Piers A-19, D-12 and D-9.7
10/40
Design Information
Source of Concrete
Mix Identification
Specified Strength p.s.i.
TXI 9505 3000
Test Results
Set CylinderI
No. ID
1 2134
2134
2134
2134
Age @
Date Tested Test
12-12-00 7
12-12-00 7
01-02-01 28
01-02-01 28
Total Load J CompressiveI Average
lbs. Strength p.s.i. Strength p.s.i.
75230 2660
72890 2580 2620
113030 4000
114590 4060 4030
Cylinder Data
Set I Cylinder
2'134
Time of
Slump Sample Air Temp.
6.00 12:45PM 55
Concrete I Air J Ticket
Temp. Entrainment Number
62 N/A 2789880
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019