Northlake 635(4)-LR001204 GEOTECHNICAL AND
ENVIKONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number I Location
REPORT NO. 53
REG PROJECT NO. 7044
SAMPLE DATE: 12-04-00
TECHNICIAN: B. Steadman
Quantity Represented
Piers: A.5-19, A-15.2, B.1-19, B.8-19 and C.3-19 20/35
Design Information
lSource of Concrete
TXI
J Mix Identification J
9505
Specified Strength p.s.i.
3OOO
Test Results
Set CylinderI
No. ID Date Tested
1 1971 12-11-00
1971 01-01-01
1971 01-01-01
1971 Hold
Age@ Total Load I CompressiveI Average
Test lbs. Strength p.s.i. Strength p.s.i.
7 80430 2850
28 133400 4720
28 135020 4780
H
4750
Cylinder Data
Set I Cylinder
1971
Time of
Slump Sample
ConcreteI Air J Ticket
Air Temp. Temp. Entrainment Number
5.50 3:15AM 55
60 N/A 2788970
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC,
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600" FAX [214] 350 0019