Northlake 635(4)-LR001201 (2) GEOTECHNICAL AND
ENVIP. ONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number I Location
1 Piers A-l, A-1.5 and A-2
REPORT NO. 49
REG PROJECT NO. 7044
SAMPLE DATE: 12-01-00
TECHNICIAN: J. Stuart
Quantity Represented
10/10
Design Information
ISource of Concrete
TXI
Mix Identification
95O5
Specified Strength p.s.i.
3000
Test Results
SetNo. CylinderlID
1 1797
1797
1797
1797
I Age@ I Total Load
Date Tested Test lbs.
12-08-00 7 83450
12-08-00 7 84600
12-29-00 28 135750
12-29-00 28 122040
I CompressiveI Average
Strength p.s.i. Strength p.s.i.
295O
2990 2970
4800
4320 4560
Cylinder Data
Set Cylinder
I Time of I Concrete
ID Slump Sample Air Temp. Temp.
1797 5.25 1:30PM 63 68
Air Ticket
Entrainment Number
N/A 2787198
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 * 'rEL [214] 350 5600 * FAX [214] 350 0019