Loading...
Northlake 635(4)-LR001201 (2) GEOTECHNICAL AND ENVIP. ONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number I Location 1 Piers A-l, A-1.5 and A-2 REPORT NO. 49 REG PROJECT NO. 7044 SAMPLE DATE: 12-01-00 TECHNICIAN: J. Stuart Quantity Represented 10/10 Design Information ISource of Concrete TXI Mix Identification 95O5 Specified Strength p.s.i. 3000 Test Results SetNo. CylinderlID 1 1797 1797 1797 1797 I Age@ I Total Load Date Tested Test lbs. 12-08-00 7 83450 12-08-00 7 84600 12-29-00 28 135750 12-29-00 28 122040 I CompressiveI Average Strength p.s.i. Strength p.s.i. 295O 2990 2970 4800 4320 4560 Cylinder Data Set Cylinder I Time of I Concrete ID Slump Sample Air Temp. Temp. 1797 5.25 1:30PM 63 68 Air Ticket Entrainment Number N/A 2787198 Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 * 'rEL [214] 350 5600 * FAX [214] 350 0019