Northlake 635(4)-LR001129 (2) GEOTECHNICAL AND J ~ J:==J I'--1
ENVIRONMENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr, Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number J Location
Piers: C-12, C-13, C-14
REPORT NO. 47
REG PROJECT NO. 7044
SAMPLE DATE: 11-29-00
TECHNICIAN: J. Stuart
J Quantity Represented
10/10
Design Information
JSource of Concrete J
TXI
Mix Identification
9505
Specified Strength p.s.i.
3000
Test Results
Set Cylinder
No. ID
Date Tested
Age @
Test
Total Load I CompressiveI Average
lbs. Strength p.s.i. Strength p.s.i.
1687
1687
1687
1687
12-06-00
12-06-00
12-27-00
12-27-00
7
7
28
28
105430 3730
113560 4020 3880
Cylinder Data
Set
Cylinder J Time of
ID SlumpJ Sample
1687 4.75 9:45AM
Concrete Air J Ticket
Air Temp. Temp. Entrainment Number
54 63 N/A N/A
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019