Northlake 635(4)-LR001101GEOTECHNICALAND ~ R I'-I I I J~
ENVIRONHENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
A'I'TN: Mr. Ed T. McGuire
CONTRACTOR: Bob Moore Construction Co.
REPORT NO. 39
REPORT DATE: 11-01-00
REG PROJECT NO. 7044
TECHNICIAN: F. Steadman
PAGE: 1 of 1
On this date a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (ft) (psi) (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Rigs (ea) (ft) (ft)
1 4 12 5
Date Area Iniected (sq fi) Average Pressure (psi) Pass No.
10-28-00 4,000 165 7
Surfactant added at regular intervals: Yes
Mail
Distribution: (1)
Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
TB/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019