Loading...
North Texas Mail-CS 890403 Ap'r'-il q. lg8,~ Paul C. Ralston Spaw-Glass General Contractors, Inc. 2120 Walnut Hill Lane Suite 180 Irving, Texas 75038 RE: Royal Lane Dear Mr. Ralston: This letter is to formerly notify you of items your company will need to address in reference to the left turn lane constructed by your company on Royal Lane. 1) Backfilling of Median A) All backfill will need to be compacted to the back of curb and hand raked to match the existing median. B) All backfill material shall be free of concrete, rock, and other debris. C) Sealing of all joints. D) Valve stack cover to be clean of concrete and painted red. E) The two approach tie-in, north 'of your present Royal Lane entry, will need to be either backfilled or completed to keep water from contaminating Royal Lane subbase. If you have any questions, please feel free to contact me at 462-8495. Thank.>pTou, . ___~.~.C..d"-~. ~ Steven M, Mort:_on Chi-+f--l=u-blic Works Inspector cc: Steve Ooram, Director of Public Works