Loading...
Northlake 635(4)-LR001031GEOTECHNICALAND ~ R I-'1 I I F=~ ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 A'I'TN: Mr. Ed T. McGuire REPORT NO. 37 REPORT DATE: 10-31-00 REG PROJECT NO. 7044 PAGE: 1 of 1 CONTRACTOR: Bob Moore Construction Co. AREA REPRESENTED: Lines A to D from 1 to 2, lines C to D from 1 to 6, lines A to D from 18 to 19 and from lines A to B from 14 to16 Boring Number/Pocket Pen Sampled (feet) W-17 W-18 W-19 W-20 W-21 W-22 W-23 10-25-00 0.0- 1.5 4.5+ 1.30 1.50 4.50 2.30 2.30 0.50 1.5- 3.0 2.70 2.75 2.00 4.5+ 1.80 2.50 1.00 3.0- 4.5 4.00 2.05 1.50 4.5+ 4.50 3.50 1.10 4.5- 6.0 4.50 1.75 2.10 4.10 3.90 2.00 1.50 6.0- 7.5 4.50 3.30 1.75 4.5+ 3.50 3.10 1.50 7.5- 9.0 3.50 2.50 1.80 4.50 3.80 2.75 1.75 9.0- 10.0 2.80 2.05 2.00 3.50 3.50 3.50 0.80 Comments: Borings obtained after seven injection passes. It is recommended that additional borings be conducted in the area of W-20 to better evaluate moisture conditions at this location. Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019