Northlake 635(4)-LR001031GEOTECHNICALAND ~ R I-'1 I I F=~
ENVIRONMENTAL CONSULTANTS
POST INJECTION CONFIRMATION RESULTS
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
A'I'TN: Mr. Ed T. McGuire
REPORT NO. 37
REPORT DATE: 10-31-00
REG PROJECT NO. 7044
PAGE: 1 of 1
CONTRACTOR: Bob Moore Construction Co.
AREA REPRESENTED: Lines A to D from 1 to 2, lines C to D from 1 to 6,
lines A to D from 18 to 19 and from lines A to B from
14 to16
Boring Number/Pocket Pen
Sampled (feet) W-17 W-18 W-19 W-20 W-21
W-22 W-23
10-25-00
0.0- 1.5 4.5+ 1.30 1.50 4.50 2.30 2.30 0.50
1.5- 3.0 2.70 2.75 2.00 4.5+ 1.80 2.50 1.00
3.0- 4.5 4.00 2.05 1.50 4.5+ 4.50 3.50 1.10
4.5- 6.0 4.50 1.75 2.10 4.10 3.90 2.00 1.50
6.0- 7.5 4.50 3.30 1.75 4.5+ 3.50 3.10 1.50
7.5- 9.0 3.50 2.50 1.80 4.50 3.80 2.75 1.75
9.0- 10.0 2.80 2.05 2.00 3.50 3.50 3.50 0.80
Comments: Borings obtained after seven injection passes. It is recommended that additional borings be
conducted in the area of W-20 to better evaluate moisture conditions at this location.
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/mm