WA9302-CS 951031SHIMEK, JACOBS & FINKLEA CONSTRUCTION REPORT ProjeetNo. 94155 Date: 10-31-95 Prepared ~ Is This A By: Matt Hiekey ~ Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Contractor: NATGUN Time Allotted: 300 Used: 100 Number Superintendent: John Holroyd Men Working: 6 Hours: 9:00 AM to 9:30 AM Weather Conditions: Cloudy and Cool Site Conditions: The site was wet and the pad was muddy. WORK DESCRIPTION 1. Two hundred and ninety nine piers are completed. 2. Work was halted around 10:00 A.M. on October 30 because of rain. 3. It is expected that no additional concrete pours will occur today because of the mud on the tank pad. 4. The exposed steel reinforcement on the completed piers is being cut to 1' - 9" above the top of the piers. 5. The superintendent was made aware of silt fence problems. The silt fence located along the southeast corner of the pump station site was knocked over by steel ties. Additional silt fence problems were discovered along the southern fence line of the site. 6. The temporary culvert constructed on the site is not allowing the runoffto pass. Both ends of the pipe are crushed. As a result, the rain that occurred on October 30 caused excessive ponding. The superintendent indicated that the problem will be corrected. 7. An additional Natgun storage trailer was moved on site for the storage of hand tools. The trailer was placed on the south side of the driveway that runs between the existing and proposed ground storage reservoirs.