Loading...
Northlake 635(4)-LR001031 (3)GEOTECHNICAL AND J:~ J::=J I'--1 I I I=~ ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire REPORT NO. 38 REPORT DATE: 10-31-00 REG PROJECT NO. 7044 PAGE: 1 of 1 CONTRACTOR: Bob Moore Construction Co. AREA REPRESENTED: Pad from lines between 6 and 11 C and D. Boring Number/Pocket Pen Date Depth J J Sampled (feet) W-24 W-25 W-26 10-26-00 0.0- 1.5 0.75 3.25 1.25 1.5- 3.0 1.00 4.5+ 1.25 3.0- 4.5 1.25 4.50 1.25 4.5- 6.0 3.25 3.50 2.00 6.0- 7.5 1.75 2.50 1.50 7.5- 9.0 1.75 2.50 2.00 9.0- 10.0 1.00 N/A 2.25 Comments: Borings obtained after seven injection passes in the area of Boring W-20. Based on these results, an additional pass was considered necessary from C to D between 9 and 11. No confirmation borings are considered necessary. Mail Distribution: (1) (1) (1) Bob Moore Construction Co./ Mr. Ed T. McGuire City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/mm 2424 STUTZ DR. · SUITE 400 - DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214] 350 0019