Northlake 635(4)-LR001031 (3)GEOTECHNICAL AND J:~ J::=J I'--1 I I I=~
ENVIRONMENTAL CONSULTANTS
POST INJECTION CONFIRMATION RESULTS
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 38
REPORT DATE: 10-31-00
REG PROJECT NO. 7044
PAGE: 1 of 1
CONTRACTOR: Bob Moore Construction Co.
AREA REPRESENTED: Pad from lines between 6 and 11 C and D.
Boring Number/Pocket Pen
Date Depth J J
Sampled (feet) W-24 W-25 W-26
10-26-00 0.0- 1.5 0.75 3.25 1.25
1.5- 3.0 1.00 4.5+ 1.25
3.0- 4.5 1.25 4.50 1.25
4.5- 6.0 3.25 3.50 2.00
6.0- 7.5 1.75 2.50 1.50
7.5- 9.0 1.75 2.50 2.00
9.0- 10.0 1.00 N/A 2.25
Comments:
Borings obtained after seven injection passes in the area of Boring W-20.
Based on these results, an additional pass was considered necessary
from C to D between 9 and 11. No confirmation borings are
considered necessary.
Mail
Distribution: (1)
(1)
(1)
Bob Moore Construction Co./
Mr. Ed T. McGuire
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/mm
2424 STUTZ DR. · SUITE 400 - DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214] 350 0019