Loading...
Northlake 635(4)-LR001030GEOTECNNICALAND J~ J:::J J~J I I I~a ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: CONTRACTOR: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire Bob Moore Construction Co. REPORT NO. 35 REPORT DATE: 10-30-00 REG PROJECT NO. 7044 TECHNICIAN: H. Thornton PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth J Injection Spacin. J Injection Pressure Injection Intervals (fi) I (fi) J (psi) (in) 10 5 100-200 12-18 Equipment Rigs (ea) (fi:) (fi) 2 4 11.5 5 Date Arealnjected(sq fi) Average Pressum(psi) Pass No. 10-21-00 3,300 100 7 10-22-00 15,980 100 7 10-23-00 4,300 100 7 Surfactant added at regular intervals: Yes Mail Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019