Northlake 635(4)-LR001030GEOTECNNICALAND J~ J:::J J~J I I I~a
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
CONTRACTOR:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
Bob Moore Construction Co.
REPORT NO. 35
REPORT DATE: 10-30-00
REG PROJECT NO. 7044
TECHNICIAN: H. Thornton
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth J Injection Spacin. J Injection Pressure Injection Intervals
(fi) I (fi) J (psi) (in)
10 5 100-200 12-18
Equipment
Rigs (ea) (fi:) (fi)
2 4 11.5 5
Date Arealnjected(sq fi) Average Pressum(psi) Pass No.
10-21-00 3,300 100 7
10-22-00 15,980 100 7
10-23-00 4,300 100 7
Surfactant added at regular intervals: Yes
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg