Loading...
Northlake 635(2)-LR 970310TECHNOLOGIES INC I~E1K)RT OF CONCRETE INSPECTION CLW. NT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 090~ REPORT NO.: 1131{ DATE OF SERVICE: AUTHORIZATION: REPORT DATE:. 3/ SERVICF_~: Observe concrete mixture for consistency at placement loc required field tests, and prepare compressive strength GI CONTRACTO~ BUTLER CONSTRUCTION CONCRETE SUPPLeR: PIONEER PLANT: 22 PROJECT DATA CLASS OF CONCRETE: DESIGN MIX NUMBER: REPORT OF INSPECTION 93: BATCH PROPORTION$ Ceme~ ASTM C-150 470 Bm. C~x~Aggr.: ASTM C-33 1840 Bm. Fme A~r.: ASTM C-33 1488 Bm. Adm~: ASTM C-494 14.1 cwt. Total Water: 266.0 Bm. Wa~xlC~m~tRafi0: 0.57 Lb/Lb Slump Rm~e fin.) 6-7" P~n~e Of ~ Concrete WtJCu. Ft.: Air Temp. Range (F): 49-57 Weather Coadi~ms: OVERCAST Tilt walls on building No. Cu.Y~.P~: 364 b T~h.~4-.~ David King ~,--~u~d 06:00AM S ~V[MARYQFINSPF_~TION; The technician observed the concrete mixture at placement 1 concrete was checked for proper mixing, and a visual est{ma made. Also, the concrete was observed for workability, coq uniformity. Samples of concrete were obtained for the requ and preparation of compressive strength specimens for labor Test results appear on Report of Concrete Compressive Stren TKhni~an: David King Technician Repor~ Distribution: (1) Lincotn Property Co. (1) A.E.C.C. ¢~) SUTLE. CONSTRUCTIO. ~.CO.P. (1) BROCI(ETT-OAVIS-DRAKE, INC. (1) THE CITY OF COPPELL awr c (1) O'BRIEN ASSOCXATES, INC. Tech. ~outhwestem Labs 57s lams S~' Dr. e.O. ~z L~4,1~? Tdep~ (214) 631-270~ F~ ~14) ~IDI 505034 ~3 :/28/97 ~0/97 ation, perform ~ecimens. 7 ~ Co~ Po-o.e (%): N/A N/A Conc. Temp. l~m~e ~9: 59-62 49 DEGREES o. Test Spec.: 12 ~pped 02:00PM ocation. The te of slump was sistency, and ired field tests atory testing. gth. LABS 'Bracken, B.S. Ch. E. oject Manager