Northlake 635(2)-LR 970310TECHNOLOGIES INC
I~E1K)RT OF
CONCRETE INSPECTION
CLW. NT: Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 090~
REPORT NO.: 1131{
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE:. 3/
SERVICF_~: Observe concrete mixture for consistency at placement loc
required field tests, and prepare compressive strength GI
CONTRACTO~ BUTLER CONSTRUCTION
CONCRETE SUPPLeR: PIONEER
PLANT: 22
PROJECT DATA
CLASS OF CONCRETE:
DESIGN MIX NUMBER:
REPORT OF INSPECTION
93:
BATCH PROPORTION$
Ceme~ ASTM C-150 470 Bm.
C~x~Aggr.: ASTM C-33 1840 Bm.
Fme A~r.: ASTM C-33 1488 Bm.
Adm~: ASTM C-494 14.1 cwt.
Total Water: 266.0 Bm.
Wa~xlC~m~tRafi0: 0.57 Lb/Lb
Slump Rm~e fin.) 6-7"
P~n~e Of ~ Concrete WtJCu. Ft.:
Air Temp. Range (F): 49-57
Weather Coadi~ms: OVERCAST
Tilt walls on building
No. Cu.Y~.P~: 364 b
T~h.~4-.~ David King
~,--~u~d 06:00AM S
~V[MARYQFINSPF_~TION;
The technician observed the concrete mixture at placement 1
concrete was checked for proper mixing, and a visual est{ma
made. Also, the concrete was observed for workability, coq
uniformity. Samples of concrete were obtained for the requ
and preparation of compressive strength specimens for labor
Test results appear on Report of Concrete Compressive Stren
TKhni~an: David King
Technician
Repor~ Distribution:
(1) Lincotn Property Co. (1) A.E.C.C.
¢~) SUTLE. CONSTRUCTIO. ~.CO.P.
(1) BROCI(ETT-OAVIS-DRAKE, INC.
(1) THE CITY OF COPPELL
awr c
(1) O'BRIEN ASSOCXATES, INC.
Tech. ~outhwestem Labs
57s lams S~' Dr. e.O. ~z L~4,1~?
Tdep~ (214) 631-270~
F~ ~14) ~IDI
505034
~3
:/28/97
~0/97
ation, perform
~ecimens.
7
~ Co~ Po-o.e (%): N/A
N/A
Conc. Temp. l~m~e ~9: 59-62
49 DEGREES
o. Test Spec.: 12
~pped 02:00PM
ocation. The
te of slump was
sistency, and
ired field tests
atory testing.
gth.
LABS
'Bracken, B.S. Ch. E.
oject Manager