Loading...
Northlake 635(4)-LR001019 GI:OT£CNNICAL AND I:NVIRON PII:NTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire CONTRACTOR: Bob Moore Construction Co. REPORT NO. 29 REPORT DATE: 10-19-00 REG PROJECT NO. 7044 TECHNICIAN: H. Thornton PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 1 4 11.5 5 Date Area Injected (sq fi) Average Pressure (psi) Pass No. 0-12-00 10,700 150 6 0-13-00 4,700 150 6 Surfactant added at regular intervals: Yes Mail Distribution: (1 ) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019