POST INJECTION CONFIRMATION RESULTS
Coppell Tech Center II
1322 Crestside
Coppell, Texas
REPORTED TO:
Bob Moore Construction Co.
1110 N. Watson Road
Arlington, Texas 76011
ATTN: Mr. Ed T. McGuire
REPORT NO. 30
REPORT DATE: 10-18-00
REG PROJECT NO. 7044
PAGE: 1 of 1
CONTRACTOR: Bob Moore Construction Co.
AREA REPRESENTED: Portions of building pad along east and west wing.
Boring Number/Pocket Pen
Date
Sampled I Depth
10-16-00
0.0- 1.5 1.00 2.70 2.75 3.00 2.50 1.80 0.50
1.5- 3.0 2.50 1.50 4.5+ 4.30 1.30 4.30 2.00
3.0- 4.5 2.50 4.10 2.50 1.40 3.80 3.50 2.50
4.5- 6.0 4.5+ 3.50 3.50 3.80 2.10 4.30 3.10
6.0- 7.5 3.10 3.40 3.10 2.50 2.10 2.75 2.40
7.5- 9.0 3.30 2.00 2.50 3.50 3.10 3.25 4.00
9.0 - 10.0 2.50 2.25 2.50 2.90 2.80 4.25 3.50
Comments:
Mail
Distribution:
Borings obtained after six injection passes. Based on these results, an additional
pass is considered necessary from building line 1 to 2, from rows A to D; from lines
1 to 6, rows C to D; from lines 18 to 19, rows Ato D; and form lines 14 to 19,
rows A to B. Confirmation borings should be made after completion of this pass.
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
AE/cg