Loading...
Northlake 635(4)-LR001018GEOTECHNICALAND J~ J~J I-1 I I F~J ENVlP~ONI'4 ENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Coppell Tech Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. 1110 N. Watson Road Arlington, Texas 76011 ATTN: Mr. Ed T. McGuire REPORT NO. 30 REPORT DATE: 10-18-00 REG PROJECT NO. 7044 PAGE: 1 of 1 CONTRACTOR: Bob Moore Construction Co. AREA REPRESENTED: Portions of building pad along east and west wing. Boring Number/Pocket Pen Date Sampled I Depth 10-16-00 0.0- 1.5 1.00 2.70 2.75 3.00 2.50 1.80 0.50 1.5- 3.0 2.50 1.50 4.5+ 4.30 1.30 4.30 2.00 3.0- 4.5 2.50 4.10 2.50 1.40 3.80 3.50 2.50 4.5- 6.0 4.5+ 3.50 3.50 3.80 2.10 4.30 3.10 6.0- 7.5 3.10 3.40 3.10 2.50 2.10 2.75 2.40 7.5- 9.0 3.30 2.00 2.50 3.50 3.10 3.25 4.00 9.0 - 10.0 2.50 2.25 2.50 2.90 2.80 4.25 3.50 Comments: Mail Distribution: Borings obtained after six injection passes. Based on these results, an additional pass is considered necessary from building line 1 to 2, from rows A to D; from lines 1 to 6, rows C to D; from lines 18 to 19, rows Ato D; and form lines 14 to 19, rows A to B. Confirmation borings should be made after completion of this pass. (1) Bob Moore Construction Co./ Mr. Ed T. McGuire (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) McHale Consulting Engineering/ Mr. Gary McHale (1) CMC-Commercial Realty/ Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. AE/cg 2424 STUTZ DR,. · SUITE ~.00 · DALLAS, TX 75235 · TEL [21~t] 350 5600 · FAX [21'I] 350 0019