On these dates a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure I Injection Intervals
(fi) (fi) (psi) I (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes I Length of Probes t Probe Spacing
Rigs (aa) I (ft) I (ft)
1 4 11.5 5
Date I Area Injected (sq ft) I Average Pressure (psi)
Pass No.
10-10-00 2,000 150 5
5,640 150 6
10-11-00 8,040 150 6
Surfactant added at regular intervals: Yes
Mail
Distribution:
(1) Bob Moore Construction Co./
Mr. Ed T. McGuire
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) McHale Consulting Engineering/
Mr. Gary McHale
(1) CMC-Commercial Realty/
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
TB/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 o FAX [214] 350 0019