Loading...
Northlake 635(2)-LR 970210 (3)Maxi~ 257 TECHNOLOGIES INC CLIENT: PROJECT: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903( REPORT NO.: 11212 DATE OF SERVICE: 2 AUTHORIZATION: REPORT DATE: 2/1 SERVICES: Test compressive strength specimens prepared in conjuncti inspection. PROJECT DATA CONTRACTOR: BUTLER CONSTRUCTION MIX DESIGN NUMBER: 9349 CONCRETE SUPPLIER: PTONEER DATE OF PLACEMENT: 2/0 PLANT: 29 TIME SAMPLED: 04 = 45~v[ SPECIFICATION REQUIREMENTS TEMPERATURE (IF) - AIR: 58 STRENGTH: 4000psi @ 28 DAYS TRUCK NO: 122 SLUMP: 5" AIR CONTENT(%): N/A METHOD OF TEST: ASTM C-39 LOCATION OF PLACEMENT: 85' North, 25' east Corner building B CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) i i 3.00 2/10/97 7 1 2 3/03/97 28 1 3 3/03/97 28 1 4 HOLD HOLD REPORT OF TESTS o CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM DIAMETER AREA LOAD (in.) {sq.in.) (lbs. force) 6.00 28.27 158670 Technician: Stewart Ainsworth Technician Report Of Tests Continued On Page 2 1001 LW n Tech.· Southwestern Labs 5 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: {214) 920-1891 ,05034 /03/97 3/97 with concrete 3/97 BY: Stewart Ainsworth CONCRETE: 68 TICKET NO: 334864 Df southwest building DMPRESSIVE STRENGTH (psi) 5610 REMARKS Our lette~l end reporte are for the exclusive uae of the c ont to whom they are addreeeed and shill not be reprodu¢ ~d except in full without the approval of the teetin~l laboratory. The uae of ournlme mu~t receive our written approval, Our tett ~re and reports aloply only to the simple teated and/or inef~cted, end are not inclicetive of the clu&ntitiea of apparently identical or s miler products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 2/03/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 2/0, TIME SAMPLED: 06: 45~ TEMPERATURE ( I F) - AIR: 58 TRUCK NO: 144 AIR CONTENT{%): N/A LOCATION OF PLACEMENT: 90' North, 100' east corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 5.00 2/10/97 2 2 3/03/97 2 3 3/03/97 2 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) {in.) {sq.in.) (lbs. force) 7 28 28 HOLD 6.00 28.27 144630 Technician: Stewart Ainsworth Technician Report Of Tests Continued On Page 3 1001 LW REPORT NO. PAGE 2 SET NO. 2 112128 3/97 BY: Stewart Ainsworth CONCRETE: 69 TICKET NO: 334883 of northwest building )MPRESSIVE STRENGTH {psi) REMARKS 5110 Our letters and rap~ ara for the exclusive uae of the client to whom they ers addrmmed ~ ~NI not ~ re~r~ ex.pt in full without t~ .~provll of t~ telti~ laboratory. T~ ~ of ourname m~t recmve o~ wr~tt~ ~provl. u~ left, ~ re.ti apply only to the sample test~ a~/or i~Oected. ~ are not i~icative of the quantitJ~ of apparently identicN or ~il~ pr~ucts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 2/03/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 2/02 TIME SAMPLED: 09: TEMPERATURE ( I F) - AIR: 61 TRUCK NO: 100 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 135' North, 140' eas~ corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 3.00 2/10/97 3 2 3/03/97 3 3 3/03/97 3 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) (in.) (sq.in.) {lbs. force) 7 28 28 HOLD 6.00 28.27 15o0910 C( Technician: Stewart Ainsworth Technician Report Of Tests Continued On Page 4 1001 LW REPORT NO. PAGE 3 SET NO. 3 112128 1/97 BY: Stewart Ainsworth CONCRETE: 69 TICKET NO: 334904 of southwest building MPRESSIVE ;TRENGTH (psi) REMARKS 5340 Our lette~ and report~ are for the exckmive u~e of the client to whom they ere md~lr~el and sh~l not ~ re~r~uc~ exit in full without t~ approval of t~ t~ti~ laboratory. T~ ~ of ourname m~t rec~ve o~ wrl~en Ip~OVM. U~ le~ ~ ~ repo~ a~ply only to t~ samole teated e~/or inspectS, a~ ere not i~icative of t~ Quantiti~ of aDparently identical or si ~ilu pr~uc~. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 2/03/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 2/0 TIME SAMPLED: 12: 10PM TEMPERATURE ( I F) - AIR: 65 TRUCK NO: 98 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 75' South, 135' west corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 4.50 2/10/97 4 2 3/03/97 4 3 3/03/97 4 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) (in.) {sq.in.) {lbs. force) 7 28 28 HOLD 6.00 28.27 1~6710 Technician: Stewart Ainsworth Technician Report Of Tests Continued On Page 5 1001 LW REPORT NO. PAGE 4 SET NO. 4 112128 9/97 BY: Stewart Ainsworth CONCRETE: 70 TICKET NO: 334923 of northeast building )MPRESSIVE ~TRENGTH (psi) REMARKS 5190 Our letters end reportl ere for the exclusive Line of the client to whom they are adf:lrea~ed and Ihell net be te~oroduc~ d except in full without the approvl~ of the tearing IlbOrltory. The u~e of ournarne mu~t receive ot,~' written approval, uL~r left; ri ~ re!oorti ai3ply only to the samolo te~ted and/or insi~ected, and are not im:iic&tivo of the quantities of ai~parently identical or si nila~ products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 2/03/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 2/0 TIME SAMPLED: Ol:45PM TEMPERATURE ( I F) - AIR: 70 TRUCK NO: 131 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 50' South, 80' west corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 5 1 5.25 2/10/97 5 2 3/03/97 5 3 3/03/97 5 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) {in.) (sq.in.) (lbs. force) 7 28 28 HOLD 6.00 28.27 1%3010 Technician: Stewart Ainsworth Technician Report Of Tests Continued On Page 6 1001 LW REPORT NO. PAGE 5 SET NO. 5 112128 3/97 BY: Stewart Ainsworth CONCRETE: 71 TICKET NO: 340625 )f northeast building )MPRESSIVE STRENGTH (psi) REMARKS 4350 Our letterl and reportll ara for the exclusive ule of the client te whom they ~re ldf]relled I~d Ihall n~t b? re.~t~,uc~ d except in Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 2/03/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 2/0 TIME SAMPLED: 04: 15PM TEMPERATURE ( I F) - AIR: 74 TRUCK NO: 296 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 25' North, 25' west corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. {inches) TESTED ~6 1 4.25 2/10/97 6 2 3/03/97 6 3 3/03/97 6 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) {in.) Isq.in.) {lbs. force) 7 28 28 HOLD 6.00 28.27 1{3380 Technician: Stewart Ainsworth Technician Report Distribution: (1) Lincol. n Proper~y Co. (1) BUTLER CONSTRUCTION [NCOEP. (1) BR0CKETT-DAVIS-DRAKE, INC. (1) THE CITY 0F C0PPELL (1) THE CITY OF COPPELL (1) 0'BRIEN ASSOCIATES, INC. 1001 LW Our letterl end reportl ua for the exclueive u~e of the client to whom they are addra~med and shflJJ~t be reproduc~ full without the af~l~t'oval of the tatting lal3oratory. The ~ of ournlme must ceceive our written approval. a~ply only to the semi, la tested ara/or ~nsl~ected. end are not indicative of the quantities of ~loparently identical or si REPORT NO. PAGE 6 SET NO. 6 112128 3/97 BY: Stewart Ainsworth CONCRETE: 72 TICKET NO: 340648 Df southeast building )MPRESSIVE STRENGTH Ipsi) REMARKS 5070 BS ~f~adken, B.S. Ch.E. ~ject Manager d excel~t in fliler products.